Materials Sampling and Testing Frequencies

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Minimum Required Samples and Tests

The NDOT Construction Division requires that every material incorporated into the project must be tested and accepted based on a sampling frequency for testing in order to ensure that quality materials are incorporated into the work and to meet federal requirements. These frequencies have been established based on what is necessary to help ensure consistency of the material quality.

Project

Independent Assurance (IA)

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer