Nevada Department of Transportation
Home MenuDocuments
NDOT - Bridge I-1556 Asbestos & Lead Paint Survey Report
NDOT Bridge I-3233 N_S Asbestos Lead Paint Survey Report
NDOT Bridge I-3218 N_S Asbestos Lead Paint Survey Report
I-2921 NDOT Bridge Assessment Asbestos Lead Paint Survey Report
NDOT Bridge Assessment Asbestos Lead Paint Survey Report_I-1977
NDOT Bridge I-2482 Asbestos Lead Paint Survey Report
NDOT Bridge I-1973R Asbestos Lead Paint Survey Report
NDOT - Bridge I-1952 Asbestos & Lead Paint Survey Report
NDOT Bridge I-1951 Asbestos Lead Paint Survey Report
I-1770S NDOT Bridge Assessment Asbestos Lead Paint Survey Report
I-1770N NDOT Bridge Assessment Asbestos Lead Paint Survey Report
I-1749S NDOT Bridge Assessment Asbestos Lead Paint Survey Report
I-1749N NDOT Bridge Assessment Asbestos Lead Paint Survey Report
NDOT - Bridge I-892 Asbestos & Lead Paint Survey Report
NDOT Bridge I-837_I-837_R Asbestos Lead Paint Survey Report
NDOT - Bridge I-819W Asbestos & Lead Paint Survey Report
NDOT - Bridge I-819E Asbestos & Lead Paint Survey Report
NDOT - Bridge I-816W Asbestos & Lead Paint Survey Report
NDOT - Bridge I-816E Asbestos & Lead Paint Survey Report
NDOT - Bridge I-753W Asbestos & Lead Paint Survey Report
NDOT - Bridge I-753E Asbestos & Lead Paint Survey Report
NDOT - Bridge I-750 Asbestos & Lead Paint Survey Report
NDOT Bridge I-707N_I-708S Asbestos & Lead Paint Survey Report
NDOT Bridge I-675 Asbestos Lead Paint Survey Report
NDOT - Bridge I-660 Asbestos & Lead Paint Survey Report
NDOT Bridge H-3219 N_S Asbestos Lead Paint Survey Report
NDOT Bridge H-3054 Asbestos Lead Paint Survey Report
NDOT - Bridge H-2654 Asbestos & Lead Paint Survey Report
NDOT Bridge Assessment Asbestos Lead Paint Survey Report_H-2317N_S
NDOT - Bridge H-2008 Asbestos & Lead Paint Survey Report
NDOT Bridge H-1976 Asbestos Lead Paint Survey Report
NDOT Bridge H-1974 Asbestos Lead Paint Survey Report
NDOT - Bridge G-1850 Asbestos & Lead Paint Survey Report
NDOT - Bridge G-1129 Asbestos & Lead Paint Survey Report
NDOT - Bridge G-928E Asbestos & Lead Paint Survey Report
NDOT - Bridge G-751 Asbestos & Lead Paint Survey Report
NDOT Bridge G-470 Asbestos Lead Paint Survey Report
NDOT - Bridge G-58 Asbestos & Lead Paint Survey Report
NDOT - Bridge G-53 Asbestos & Lead Paint Survey
NDOT - Bridge G-52 Asbestos & Lead Paint Survey Report
NDOT - Bridge G-38 Asbestos & Lead Paint Survey Report
NDOT Bridge B-1805 Asbestos Lead Paint Survey Report
NDOT Bridge B-1778 Asbestos Lead Paint Survey Report
NDOT Bridge B-1776 Asbestos Lead Paint Survey Report
NDOT Bridge B-1775 Asbestos Lead Paint Survey Report
NDOT Bridge B-1516S Asbestos Lead Paint Survey Report
NDOT - Bridge B-2476 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-2444 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1711 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1490 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1263S Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1263N Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1262S Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1262N Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1120 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-1119 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-646 Asbestos & Lead Paint Survey Report
NDOT Bridge B-634 Asbestos Lead Paint Survey Report
NDOT - Bridge B-638 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-606 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-580 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-577 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-575 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-565 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-553 Asbestos & Lead Paint Survey Report
NDOT Bridge B-434N Asbestos Lead Paint Survey Report
NDOT Bridge B-433N Asbestos Lead Paint Survey Report
NDOT - Bridge B-479 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-407 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-406 Asbestos & Lead Paint Survey Report
NDOT - Bridge B-223 Asbestos & Lead Paint Survey Report
2022 USFWS FHWA NDOT PBO
NDOT ENV NEPA PI Procedures March 2025_Final
NDOTWildlifeCrossingPrioritizationStudyReport04112025
Bridge I-775 WISE Asbestos Demo Survey.
Bridges 770, 774, 775, 767 WISE Lead Demo Survey
Bridge I-775 WISE Asbestos Demo Survey
Bridge I-774 WISE Asbestos Demo Survey
Bridge I-770 WISE Asbestos Demo Survey
Bridge H-767 WISE Asbestos Demo Survey
Construction Site BMPs Manual - February 2025
Construction Site BMPs Manual (February 2025)
NDOT - Bridge G-772E Asbestos & Lead Paint Survey Report (FINAL)
NDOT - Bridge G-765E Asbestos & Lead Paint Survey Report (FINAL)
NDOT - Bridge B-1532 Asbestos & Lead Paint Survey Report (FINAL)
NDOT - Bridge B-1531 Asbestos & Lead Paint Survey Report (FINAL)
NDOT - Bridge B-303 Asbestos & Lead Paint Survey Report (FINAL)
Intro to TNM-NDOT TNM 2.5 defaults-NoWatermark
Sample- No NSA TN Clearance Memo
Meter Setup
Intro to TNM-NDOT TNM 2.5 defaults
How to Conduct a Noise Measurement
2021 NDOT ESD Chapter 18 Emergency Procedures FINAL
FINAL ENV Procedures Guide Chapter 13 - Noise December 2023 CLEAN
NDOT_Inventory of Connectivity Needs_1Dec2023_Final_V1
AB112_As_Enrolled_Final
_Final PCE AGREEMENT 02_15_2022
Bridge H-1162 EW survey
Bridge 608 survey report
2022 Annual PA Report
Appendix 5 Coyote Springs Public Outreach Plan
Appendix 4 Coyote Springs Research Studies combined
Appendix 3 Coyote Springs Planning Documents combined
Appendix 2 Coyote Springs Cost Estimate and Funding Letters
Appendix 1 Coyote Springs Letters of Support combined
Coyote Springs 2023 WCPP Grant Application
74194 - Heavy metal reports_Verdi_Bridges
Bridge 422 survey report
Bridge 452 survey report
NVDOT Latino History in Nevada - Flyer
NDOT Latino History in Nevada - Introduction
3940 La Cruz survey
3936 La Cruz survey
Bridge G-29 survey report
3932 La Cruz survey
Bridge 581 survey report
10 Del Amo Survey Report
MPDF_VictoryHwy
MPDF_LincolnHwy
Chapter 18-Emergency Procedures
Bridge 1442 survey report
NV18-036+NV18-037-20210504 Lincoln and Victory Hwy Concurrence
Bridge 1412 survey report
Bridge 1443 survey report
Bridge 571S survey report
Bridge 571N survey report
Bridges 974 NS survey report
Bridges 973 NS survey report
Bridges 1109 NS survey report
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_G_RTC_Part3
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
22_FEIS_Index
21_FEIS_Chapter 6 Section 4f Evaluation
20_FEIS_Chapter 5 List of Preparers
19_FEIS_Chapter 4 Public Involvement
9_FEIS_Section 3.5 Air Quality
8_FEIS_Section 3.4 Traffic Noise
7_FEIS_Section 3.3 Environmental Justice
6_FEIS_Section 3.2 Community Resources
5_FEIS_Section 3.1 Introduction
4_FEIS_Chapter 2 Alternatives
3_FEIS_Chapter 1 Project Need
2_FEIS_Executive Summary
18_FEIS_Section 3.14 Commitments of Resources
17_FEIS_Section 3.13 Uses Versus Productivity
16_FEIS_Section 3.12 Indirect and Cumulative
15_FEIS_Section 3.11 Cultural Resources
14_FEIS_Section 3.10 Hazardous Materials
13_FEIS_Section 3.9 Vegetation Wildlife Fish
12_FEIS_Section 3.8 Water Resources
11_FEIS_Section 3.7 Visual Character
10_FEIS_Section 3.6 Transportation Services
1_FEIS_Front Matter
_FEIS_Cover Signature Abstract
Bridge 2845 survey report
Bridge 333 survey report
MPDF_VictoryHwy
MPDF_LincolnHwy
2019 NDOT PA Annual Report
C:\Users\kchmura\Documents\2018 MS4 Permit SWMP Plan_Final_March 2020_Web_R
C:\Users\kchmura\Documents\_I-15_Tropicana_FONSI
Appendix_D_Change_in_Control_of_Access_Report
Appendix_C_NDOT_Traffic_Noise_Policy
Appendix_B_SHPO_Correspondence
Appendix_A_Public_Information_Meeting_Summary_Reports
I-15_Tropicana_EA
C:\Users\kchmura\Documents\NV Wildlife Considerations Summit 10-15-19 Summary
C:\Users\kchmura\Documents\FY2019 SWMP Annual Report_Final_All_R
C:\Users\kchmura\Documents\NV summit final attendees list
C:\Users\kchmura\Documents\NV Wildlife PPTs-compressed
C:\Users\kchmura\Documents\Final Agenda
C:\Users\kchmura\Downloads\_I-515 Charleston FONSI FINAL_09192019
_I-515_Charleston_Blvd_EA_May2019
I-515 Charleston EA_AppD Community Involvement
I-515 Charleston EA AppC Tech_Reports_05012019
Charleston_I515_EA_AppB Alternatives Report
Charleston_I515_EA_AppA Agency Coordination
C:\Users\kchmura\Documents\StormwaterPollutionPrevent
Documenting NOA and Erionite in Import Material from Non-Nevada DOT Sources for Projects 2.2019
2018 Annual Report
2018 Annual Report
Record of Decision
01_Pyramid ROD - FINAL 12072018
Transportation Right of Way Markers
Chapter 13 -Traffic Noise.pdf
Chapter 13 - Traffic & Construction Noise
Documenting NOA and Erionite in Import Material for Nevada Department of Transportation Projects
Noxious Weed Checklist-Plan Form
Appendix F Traffic Sensitivity Tech Memo 042018
Appendix E Sage Grouse BLM RDF Analysis
Appendix D DEIS Comments and Resps-red
Appendix C Pref Alt 3 plans_red
Appendix B Public Inv
Appendix A Agency Coord - Part 2 red 2
Appendix A Agency Coord - Part 1 red 2
009_Chapters 7 - 10
008_Chapter 6 - Eval of Alts
007_Chapter 5 - Section 4f
006_Chapter 4 - Comments Coord
005_Chapter 3 - Env Resources
004_Chapter 2 - Alternatives
003_Chapter 1 - Purpose and Need
002_Executive Summary
001_Front Matter Table of Contents
000_FEIS Combined File
NDOT Traffic and Construction Noise Analysis and Abatement Policy 15 May 2018.aa
Environmental Services Procedures Guide
ESD Procedures Guide Cover
Preface
Chapter 1-Organization
Chapter 2-Project Development
Chapter 3-Categorical Exclusions
Chapter 4-Environmental Assessments
Chapter 5-Environmental Impact Statements
Chapter 6-Public Involvement Process
Chapter 7-Section 106
Chapter 8-Section 4(f)
Chapter 9-Socio-Economics
Chapter 10-Threatened & Endangered Species
Chapter 11-Material Sites
Chapter 12-Air Quality
Chapter 14-Hazardous Materials & Waste
Chapter 15-Other Environmental Analyses & Permits
Chapter 16-Environmental Justice
Chapter 17-NOA & Erionite
Appendix A-Acronyms
Appendix B-Directives & Guidance
2015 NDOT PA Annual Report
nvfhwafederalaidhighwaypro-2017extension
Revised 171027_MPDF
2017 Annual Report
2016 Annual Report
C:\Users\H9070krr\Desktop\NDOT Traffic and Construction Noise Analysis and Abatement Policy Eff July 2011 Last Rev 01 Dec 2017
NDOT Traffic and Construction Noise Analysis and Abatement Policy Eff July 2011 Last Rev 01 Dec 2017
Program Comment Bridge List
Bridge Program Comment
Project_NEON_02_FEIS
NEPA_US_95_Final_EIS_Vol_3
NEPA_US_95_EIS_Vol_2
NEPA_US_95_EIS_Vol_1
BC_Bypass_01_FHWA_NV_FEIS_00_02_Vol_1
ROD_FEIS_Pyramid_and_McCarran_Int
Appendix A_Alignment Map_USA Parkway EA reduced
US 95 NW EA Reevaluation 73013
SR 160 Environmental Assessment with Errata (FHWA-NV-EA 13.01)
SR 160 Environmental Assessment Finding of No Significant Impact (FONSI)
Project_NEON_03_2012_Reevaluation_Final
Project_NEON_01_ROD
NEPA_EA_09_01_LkMeadPkwy
NEPA_EA_07_02_I15South
NEPA_EA_07_01_95NW
NEPA_EA_06_01_I15North
FONSI and EA_I_15_Interchange_Milepeost_118_Mesquite
Categorical Exclusions Programmatic Agreement
BC_Bypass_05_Tolling_2013_ReEvaluation_Final
BC_Bypass_04_Reevaluation_2011_Final
BC_Bypass_03_ReEvaluation_2009_Final
BC_Bypass_02_FHWA_NV_FEIS_00_02_Vol_2
BC_Bypass_00_ROD
Appendix L_Public Scoping Comments_USA Parkway
Appendix K_Intent to Study Ltr_USA Parkway EA
Appendix C_EJ Tech Memo_USA Parkway EA
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 11 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Current and Upcoming Restrictions
Nightly (8:00 p.m. to 5:00 a.m.) Sunday, Nov. 16 to Wednesday, Nov. 19 (3 nights):
- North and southbound I-15 reduced to two lanes between Starr Ave and Sloan Rd
Funding
The total cost for construction is $81 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024 (Complete):
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025 (Complete):
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.