Nevada Department of Transportation
Home MenuDocuments
RSB Preferred Alternative 2 2023 Compressed
Reno-SBX_Flier_Fact-Sheet-map353048-1
RSB_ROD_Final
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_G_RTC_Part3 (1)
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report (1)
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Section 3.14 Commitments of Resources
FEIS_Section 3.13 Uses Versus Productivity
FEIS_Section 3.12 Indirect and Cumulative
FEIS_Section 3.11 Cultural Resources
FEIS_Chapter 6 Section 4f Evaluation
FEIS_Chapter 5 List of Preparers
FEIS_Chapter 4 Public Involvement
FEIS_Section 3.9 Vegetation Wildlife Fish
FEIS_Section 3.8 Water Resources
FEIS_Section 3.7 Visual Character
FEIS_Section 3.6 Transportation Services
FEIS_Section 3.10 Hazardous Materials
FEIS_Section 3.5 Air Quality
FEIS_Section 3.4 Traffic Noise
FEIS_Section 3.3 Environmental Justice
FEIS_Section 3.2 Community Resources
FEIS_Section 3.1 Introduction
FEIS_Front Matter
FEIS_Executive Summary
FEIS_Cover Signature Abstract
FEIS_Chapter 2 Alternatives
FEIS_Chapter 1 Project Need
I-15 South Corridor: Via Nobila Interchange
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project,
addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas
Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONS!) for the
overall project was approved by the Federal Highway Administration on April 20, 2009. In 2022, a reevaluation of
the I-15 South EA and FONS! was done to consider changing conditions and new issues that have transpired over
the last several years within the I-15 South project area.
I-15 South Corridor Improvement Project EA 2008
I-15 South FONSI- FHWA 2009
Reevaluation 2023
Project Overview
The Project is located on Interstate 15 (I-15) in Clark County, Nevada, and will consist of providing access to
the Inspirada Master Planned Community located in West Henderson, Nevada, east of the I-15. The Project
will include construction of a new interchange and extension of Via Nobila, west of Las Vegas Boulevard.
The DEPARTMENT intends to utilize a Design-Bid-Build (DBB) method for delivery of this Project. This
Project is a phase of the I-15 South Corridor and a National Environmental Policy Act (NEPA) Re-Evaluation
for this phase will be completed by the DEPARTMENT’s Environmental Division.
Project Purpose and Need
The project is to provide a grade separated interchange along I-15 at Via Nobila that currently terminates at
Las Vegas Boulevard. The secondary purpose of the project is to widen I-15 to alleviate traffic congestion
along I-15 and accommodate the proposed High-Speed Rail along the median. There were three interchange
alternatives studied to determine the most efficient system. Those included a tight diamond interchange,
single point urban interchange and a diverging diamond interchange.
The diverging diamond interchange was selected because of cost and traffic flow efficiency as depicted in
the following figure:
Funding
The total projected cost for construction is $100M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Bridge Formula Program (BFP), and State match funding.
Schedule
The project is currently progressing towards final design completion. Below is a general overview of the
design and construction schedule. The schedule is subject to change.
Final Design Completion: November 2028
Start Construction Phase: Q1 2029
Construction Phase Completion: Q1 2031
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876