Nevada Department of Transportation
Home MenuDocuments
- State Planning & Research
- Grants
- Freight
- Freight Plan Story Maps Files
- Bike and Ped
- STTAC Documents
- Aviation Planning
- Nevada Aviation System
- NAHSP
- iPad application documents
- Rail
- State Rail Plan
- Rail Plan Chapters Final
- Transportation
- Research
- Roadway Systems
- Traffic Safety Engineering
- Traffic Reports
- Connecting Nevada
- Stormwater
- Automated and Connected Vehicles
- SPR
FY26 Q1 Formal Amendment 10.7.25
FY26 AWP 9.3.25
FY 2025 Q4 Amendment (25-07)
Draft June 2025 Formal Amendment
DRAFT FY 2025 Q3 Amendment (25-03)
25-03 FY 2025 Q3 Amendment (25-03)
25-85 Amendment Summary Report
DRAFT FY25 Q2 Amendment
25-01 Amendment Summary Report
25-01 Amendment Summary Report
FFY25 Annual Work Program 8-26-2024
25-86 Amendment Summary
25-87 Amendment Summary
25-88 Amendment Summary Report
25-89 Amendment Summary
25-90 Amendment Summary Report 5-15-24
NV - Federal Lands Access Study FINAL (SMALL 2.0)_march_2025
STIP CERTIFICATION 12-18-2024 SIGNED
NVBPAB September Agenda
23-21 Report Summary
Formal Procedure and Guidance Document STIP 2024
23-19 Report Summary
Amendment Report 23-19
Amendment Report 23-15
(1)2024 SPR AWP Draft Part I & II- Amendment 1.docx
STIP Formal Procedure and Guidance Document PUBLIC COMMENT VERSION 5-29-24
Amendment Report 23-17
Amendment Report 23-17
FY 25 - FY26 Approved Betterments
CHAPTER TWO of the Research Manual (PE)
DRAFT April 2024 Amendment Report (23-13)
US50 CMP - Final Report DRAFT Feb26, 2024
US50 CMP - TransBoard_3-11-24
US50 CMP - PublicMtg2-27-24
US50 CMP - Round 6 Boards
23-85 Amendment Summary Report 2-13-2024
23-83 Amendment Summary Report 2-13-2024
23-85 Amendment Summary Report 2-13-2024
23-83 Amendment Summary Report 2-13-2024
Amendment 23-08 Non MPO
Amendment 23-06 Non MPO
Amendment 23-04 Non MPO
Amendment 23-02 Non MPO
23-84 Amendment Summary Report
QPL 20231215
23-09 Amendment Summary Report_092623
US50 CMP - Public Comment Summary and Log 8-30-23
23-05 Amendment Summary Report 8-21-2023
TPAC_Agenda_8_2_23
Scenic Byways Map 2023 FINAL
2024 Transit Pop - Amendment Report
U.S. 395 Southern Sierra Corridor Study (2007) Final
23-03 Amendment Summary Report 5-16-2023
23-03 Amendment Summary Report 5-11-2023
TPAC_Agenda_4_5_23_FINAL (1)
23-01 Amendment Summary Report 1-27-2023
23-01 Amendment Summary Report 1-27-2023
FFY23 - FFY26 Proposed STIP
NDOT Betterments List - for Website
FFY23 DRAFT Annual Work Program
FFY23 - FFY26 DRAFT STIP
FFY23 - FFY26 DRAFT 4-Year Work Program
STIP Q4 2022 (21-33)
Q3 2022 (21-25)
STIP Amendment June 2022 Transit (21-35)
Ely Downtown Infrastructure and Complete Streets
Q2 2022 (21-20_21-23)
performance management book 2021
2020 NDOT Strategic Plan
2020 NDOT Strategic Plan
Non_MPO 21-25 Formal Amendment
Formal Amendment Non_MPO 21-20
Reno Flyer 1
NVE_LasVegas_Promos_210927 1
Formal Non-MPO_AMD 21-18
21-14 Formal Amendment (Non-MPO)
FFY22_ Proposed_AWP_8_16_21
21-16_Formal_Amendment
21-12 Formal AmendmentReport_5_18_2021
21-13 NON MPO Admin Action Report
21-11 Admin Amendment Report
21-09 NON MPO Formal Amendment Report
2023 Description Index
21-10 NON MPO Administrative Amendment Report
2020 NDOT Quicks Facts & Figures
2020 NDOT Annual Report
21-05 Formal Amendment
21-08 Admin Mod Report_Public Site
2023 STATE PRESERVATION REPORT Final
2020 PERFORMANCE MANAGEMENT REPORT
21-06_Admin Modification Summary _Public Site
21-03 NONMPO_11_19_2020
21-03 Formal Amendment
21-04 Administrative Modification
21-03 Formal Amendment
21-02 Administrative Modification
20-39 Formal Amendment
I-80 Corridor Study Executive Summary
I-80 Corridor Study
I-80 Corridor Final Report Jan 2020
I-80 Appendix E
I-80 Appendix D
I-80 Appendix C
I-80 Appendix B
I-80 Appendix A
I-80, 2020 Corridor Study Final Report
Amendment Report_20-39 Formal Action_2019TIP_Combined_v5
CROSSWALKS
STIP CERTIFICATION.docx
2020_NV_TAP Guidance 1
2020_NV_TAP Guidance 2
NV Moves ELT Update
2019_FactBook
2021 Performance Management Report
performance management book 2019 print 2-10-20
Flyer_NDOT-TransitPlan_v6
2019-12-30 TRIC Circulation Options Summary FINAL
2019-12-30 TMA Executive Summary
2019-05-30 Tech Memo #3 with Appendices
2019-02-12 Tech Memo #2
2018-11-01 Tech Memo 1
Performance Management Report 2019 small final
Biennial Performance Report 2018-2021
RTCSNV - CMAQ Baseline Performance Plan - 10-03-2018
2018 Performance Management Report 2018
FFY19 STIP Process REVISED
2018 FactBook Revised
NDOT FFY18 OBLIGATION REPORT
2018 Fact Book by Performance Analysis
State Highway Preservation Report 2021
2018 Performance Management Report
2017 Performance Management Report
2017 FactBook
FFY18 STIP Process Approved
C:\Users\h9003jrd\Desktop\Performance Analysis reports\PRES REPORT 2017 WEB
performance management report 2017 Web
PRES REPORT 2017 WEB
FACT BOOK 2016 web
2003_Southern_Nevada_Transportation_Study
2002_US395WashoeStudy
2007_DouglasCarsonTravelDemandModel
2007_US_50_East_Corridor_Study
2002_Western_Nevada_Transportation_Study
2006_TrafficSafetyCharretteUS50_88
US395_Washoe_Study_Appendix
ADULTBIKE_PC_FINAL
Nevada%20Tribal%20TIPs%20from%20BIA%207-31-2015
FFY16%20STIP%20Certifications
2016%20STIP%20Process%208-27-2015
20%20year%20forecast%20for%20STIP%20091115%20
Final Report Phase 1
2009_Cost_Allocation
Uncontrolled Crosswalk Treatment Process 8-14-25
REST AREA INITIATIVE Design and Budget Guidelines
NEPA_EA_07_02_I15South
Las Vegas Stadium Traffic Assessment
Proj Status Rpt 9-30-16
I80Appendix%20N
I80Appendix%20M
I80Appendix%20L
I80Appendix%20K
I80Appendix%20J
I80Appendix%20I
I80Appendix%20H
I80Appendix%20G
I80Appendix%20F
I80Appendix%20E
NevPlan_Appendices
2007_US_50_East_Corridor_Study
NevPlan_StatewideTransPlan
I80Appendix%20C
I80Appendix%20B
I80Appendix%20A
Table%20of%20Contents
Study%20Area
Public%20and%20Stakeholder%20Involvement
Introduction
2013_04_16_Transportation_Funding_Programs
I80_2014_Appendix_04
I80_2014_Appendix_02
I80_2014_Appendix_01
2010Factbook
Fact Book 2011 Final
2012 State of Nevada Transportation Facts and Figures
2013_factbook
2015 fact book web
PRES BOOK WEB2
2014 fact book web2
VMT FEE STUDY Bk
Performance Management Report 2015 edited final
Balducci Nevada DOT HCAS Compilation Report Jul 30
2000GoodsMovment
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 11 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Current and Upcoming Restrictions
8:00 p.m. Sunday, Nov. 9 to 5:00 a.m. Monday, Nov. 10:
- Northbound I-15 reduced to two lanes between Sloan Rd and Starr Ave
- Southbound I-15 reduced to two lanes between Starr Ave and Sloan Rd
Nightly (8:00 p.m. to 5:00 a.m.) Tuesday, Nov. 11 to Friday, Nov. 14 (3 nights):
- Southbound I-15 reduced to two lanes between Starr Ave and Sloan Rd
*No work taking place Monday evening
Funding
The total cost for construction is $81 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024 (Complete):
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025 (Complete):
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.
