Nevada Department of Transportation
Home MenuDocuments
Active QPL 20250709
702.03.05 Pozzolans_ADA
497.02.04 Adhesives for Multilayer Overlays_ADA
QPL acceptance criteria_625.02.06_Alternative Portable Barrier Rail
QPL acceptance criteria_641.02.01_IMPACT ATTENUATORS_adopted 2018
Category 641.02.01a IMPACT ATTENUATORS (LOW MAINTENANCE
QPL acceptance criteria_646.02.04_SHEET MEMBRANE_adopted 2022
QPL acceptance criteria_707.03.04_JOINT SEALER (FOR WEAKENED PLANE JOINTS IN PCCP)_adopted 2022
QPL acceptance criteria_623.02.16_DUCT SEALING COMPOUND_public
QPL acceptance criteria_497.02.05_AGGREGATES FOR MULTILAYER OVERLAYS_public
Category 613.02.01_DETECTABLE_WARNINGS_(ADA_TILE)_modified_2020
646.02.02_CRACK SEALANTS
502.03.19_Fine Surface Finish (Bonded Grout)
NDOT QPL acceptance criteria_401.03.02_Asphalt Release Agents_adopted 2020_ARC
502.0204b Concrete Paint 2019.09.10 ADA
408.02.05 All Weather Asphalt Cold Patch 2019.06.25 ADA
728.03.02 Epoxy Resin Adhesive for Bonding 2019.03.12 ADA
702.03.04 Curing Compound (Bridge Deck) 2019.03.12 ADA
702.03.01d Curing Compound (White Pigmented, Wax Base) 2019.03.12 ADA
702.03.01c Curing Compound (Liquid Membrane Forming for Curing Concrete) 2019.03.12 ADA
616.03.01 Fence Post Bag Mix Concrete 2019.03.12 ADA
609.03.02 Fast Setting Concrete Products (Non Structural) 2019.03.12 ADA
505.02.03 Epoxy Coatings (for Steel Reinforcing Bars) 2019.03.12 ADA
496.02.01 Overlay System (Polyester) 2019.03.12 ADA
625.02.04 Impact Attenuator (Temporary) 2018.06.12 ADA
618.02.01a Guardrail Terminal 2018.06.12 ADA
618.02.01 Guardrail Offset Blocks 2018.06.12 ADA
616.02.01 Plastic Fence Fabric 2018.06.12 ADA
502.03.22 Joint Sealer (Along Edges of Concrete Barrier Rail) 2016.09.13 ADA
214.02.01 Mailbox Support Systems (Type C) 2018.06.12 ADA
625.02.05 Impact Attenuator (Truck Mounted) 2018.06.12 ADA
642.02.02 MSE Wall-Concrete Panel 2014.12.09 ADA
646.02.05 Liquid Membrane 2017.09.12 ADA
I-15 South Corridor: Via Nobila Interchange
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project,
addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas
Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONS!) for the
overall project was approved by the Federal Highway Administration on April 20, 2009. In 2022, a reevaluation of
the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over
the last several years within the I-15 South project area.
I-15 South Corridor Improvement Project EA 2008
Project Overview
The Project is located on Interstate 15 (I-15) in Clark County, Nevada, and will consist of providing access to
the Inspirada Master Planned Community located in West Henderson, Nevada, east of the I-15. The Project
will include construction of a new interchange and extension of Via Nobila, west of Las Vegas Boulevard.
The DEPARTMENT intends to utilize a Design-Bid-Build (DBB) method for delivery of this Project. This
Project is a phase of the I-15 South Corridor and a National Environmental Policy Act (NEPA) Re-Evaluation
for this phase will be completed by the DEPARTMENT’s Environmental Division.
Project Purpose and Need
The project is to provide a grade separated interchange along I-15 at Via Nobila that currently terminates at
Las Vegas Boulevard. The secondary purpose of the project is to widen I-15 to alleviate traffic congestion
along I-15 and accommodate the proposed High-Speed Rail along the median. There were three interchange
alternatives studied to determine the most efficient system. Those included a tight diamond interchange,
single point urban interchange and a diverging diamond interchange.
The diverging diamond interchange was selected because of cost and traffic flow efficiency as depicted in
the following figure:
Funding
The total projected cost for construction is $100M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Bridge Formula Program (BFP), and State match funding.
Schedule
The project is currently progressing towards final design completion. Below is a general overview of the
design and construction schedule. The schedule is subject to change.
Final Design Completion: November 2028
Start Construction Phase: Q1 2029
Construction Phase Completion: Q1 2031
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876