Nevada Department of Transportation
Home MenuDocuments
Memorandum of Understanding & Operating Agreement between BLM, FHWA & NDOT
Stewardship & Oversight Agreement between FHWA & NDOT
Title VI brochure - Espanol
Title VI Brochure
Nevada Highways and Your Property - Espanol
Nevada Highways and Your Property
Relocation brochure - Espanol
Relocation brochure
Acquisition brochure - Espanol
Acquisition brochure
SUR 18-18 - Flyer
Sealed Bid Proposal
SUR 18-18 - Direct sale flyer
Auction Location Map
SUR 18-18 - Public Auction Notice
SUR 18-17 - Public Auction Notice
Signs and Billboards Terms and Conditions
SUR 09-21--Public Auction Notice 2-23 (combined)
09-09--Public Auction Notice, Land Description & Map, Terms & Conditions (combined)
764 Sign Permit Ownership Transfer Form
763 Sign Permit Supplemental Application (Form Fillable)
734 Sign Permit Application (Form Fillable)
Auction 02-22 - Brochure
Map to Auction 02-22
889 Sealed Bid Proposal
Section 7.500 Occupancy Permit Addition to 2019 Right-of-Way Manual
Section 7.700 Policy on the Accommodation and Installation of Utilities Supplemental
Right-of-Way Manual Waiver Valuation Supplemental
Political Signs Brochure 2024
889 Sealed Bid Proposal
809A Virtual Public Auction Sale-Terms and Conditions
809 Public Auction Sale-Terms and Conditions of Land Sales
Location Map for Roop Street Annex
Brochure SUR 18-05
SUR 10-09 Brochure
AXPublicRequest
AX Public Use
Property Inventory 1 2021
Property Inventory 1 2021
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory 4 2020
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory 4 2020
Right-of-Way Manual
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory 8.2019
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory 5.2019
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory 3.2019
F:\CALLAHAN\AB 404 Spreadsheet\Property Inventory
F:\CALLAHAN\Property Inventory Jan 2019
F:\CALLAHAN\Property Inventory
F:\CALLAHAN\Property Inventory
F:\CALLAHAN\Property Inventory
Drainage Information Form
2021 Terms and Conditions Relating to Right-of-Way Occupancy Permits
Application and Annual Permit for Telecommunications Occupancy of NDOT R-W
Revocable Permit
F:\AB 404 Spreadsheet\Property Inventory
F:\AB 404 Spreadsheet\Property Inventory
F:\AB 404 Spreadsheet\Property Inventory
Property Inventory
I-15 South Corridor: Via Nobila Interchange
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project,
addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas
Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONS!) for the
overall project was approved by the Federal Highway Administration on April 20, 2009. In 2022, a reevaluation of
the I-15 South EA and FONS! was done to consider changing conditions and new issues that have transpired over
the last several years within the I-15 South project area.
I-15 South Corridor Improvement Project EA 2008
I-15 South FONSI- FHWA 2009
Reevaluation 2023
Project Overview
The Project is located on Interstate 15 (I-15) in Clark County, Nevada, and will consist of providing access to
the Inspirada Master Planned Community located in West Henderson, Nevada, east of the I-15. The Project
will include construction of a new interchange and extension of Via Nobila, west of Las Vegas Boulevard.
The DEPARTMENT intends to utilize a Design-Bid-Build (DBB) method for delivery of this Project. This
Project is a phase of the I-15 South Corridor and a National Environmental Policy Act (NEPA) Re-Evaluation
for this phase will be completed by the DEPARTMENT’s Environmental Division.
Project Purpose and Need
The project is to provide a grade separated interchange along I-15 at Via Nobila that currently terminates at
Las Vegas Boulevard. The secondary purpose of the project is to widen I-15 to alleviate traffic congestion
along I-15 and accommodate the proposed High-Speed Rail along the median. There were three interchange
alternatives studied to determine the most efficient system. Those included a tight diamond interchange,
single point urban interchange and a diverging diamond interchange.
The diverging diamond interchange was selected because of cost and traffic flow efficiency as depicted in
the following figure:
Funding
The total projected cost for construction is $100M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Bridge Formula Program (BFP), and State match funding.
Schedule
The project is currently progressing towards final design completion. Below is a general overview of the
design and construction schedule. The schedule is subject to change.
Final Design Completion: November 2028
Start Construction Phase: Q1 2029
Construction Phase Completion: Q1 2031
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov