Nevada Department of Transportation
Home MenuDocuments
4.07.26 DBE IFRSigned9302025
4.07.26 DBE IFR Guidance9302025
4.07.26 Personal Narrative Example Non-Construction (1)
4.07.26 Personal Narrative – Example Construction (1)
4.07.26 NDOT nondiscrimination notice
4.07.26 NDOT FTA 2528 T6 Plan Signed 1
4.07.26 NDOT 2025 FHWA Title VI Plan as submitted
Title VI Complaint Procedures Spanish
Title VI Complaint Procedures
Title VI Complaint Form Spanish TTULO VI FORMULARIO DE QUEJA DE DISCRIMINACIN
Title VI Complaint Form
Personal Net Worth Statement 492024
NAICS Code Expansion or Change Request Form
Key Changes Under the IFR
DECLARATION OF ELIGIBILITY 492024
DBE Yearly Trucking Firm Equipment Listfillable
DBE Weekly Trucking Report formfillable
CUsersh9003jrdDesktopDBE from TerryDBE Trucking
4.01 Guide for Writing a Social Disadvantage Narrative
NDOT FTA 25-28 T6 Plan Signed (1)
NDOT 2025 FHWA Title VI Plan - as submitted
Key Changes Under the IFR
DBE IFR.Signed.9-30-2025
DBE IFR Guidance.9-30-2025
Personal Narrative – Example Construction
Personal Narrative Example Non-Construction
NDOT 2025 FHWA Title VI Plan - as submitted
Example PN for individual showing of disadvantage Small Business
Example PN for individual showing of disadvantage Women
Example PN for individual showing of disadvantage Minority
Example PN for individual showing of disadvantage LGBTQ
Example PN for individual showing of disadvantage Female Minority
Example PN for individual showing of disadvantage Caucasian Male
NDOT 26-28 Triennial DBE Goal Presentation Public Meeting Notice
2026-2028 Triennial DBE Goal Public Information Meeting
FFY25_Title_VI_Plan_Complete (1)
NDOT_DBE_Plan_8.20.24 Signed
NDOT DBE Plan 8.20.24
Title VI Complaint Form
NDOT_DBE_Plan_8.20.24
FFY25_Title_VI_Plan_Complete signed
guide-for-writing-a-social-disadvantage-narrative
NDOT LAP 2024
DBE Cover Letter Template Nevada
Personal Net Worth Statement 4.9.2024
UCA 4.09.2024
DECLARATION OF ELIGIBILITY 4.9.2024
DBE Performance Plan Considerations
NUCP Interstate Certification Affid
Title VI Complaint Form
NDOT nondiscrimination notice
DBE Plan 8.2023 signed
DBE Plan 8.2023
Title VI Complaint Form Spanish (TÍTULO VI FORMULARIO DE QUEJA DE DISCRIMINACIÓN)
NOTICE FTA DBE Goal
2023-2025 FTATriennialDBEGoal info for posting
2023 LAP
NDOT Limited English Proficiency Plan
NDOT 2024 Title VI Implementation Plan Complete
NDOT Goal Methodology FFYS 2023-2025 Final 7.26.22
Nevada Department of Transportation Disparity Study 2021
NDOT Disparity Study Presentation 5-24-22
2023-2025 Triennial DBE Goal Public Information Meeting
2022 ADA Field Guide
FTA_Title_VI_for_NDOT_9.14.21
NDOT 2023-25 Triennial DBE Goal Presentation Public Meeting Notice
NDOT 2021-2023 FTATriennialDBEGoalMethodology with noted changes
2021-2023 FTATriennialDBEGoalMethodology 2.17.21
2021-2023 FTATriennialDBEGoalMethodo
FFY 2021 Title VI Implementation Plan Complete
NOTICE
FTATriennialDBEGoalMethodo
NDOT Goal Methodology FFYS 2020-2022
NDOT FTA DBE Plan Oct 2019
DBE Handbook 6-4-19_
Orientation, 8-27-19
NDOT DBE Orientation 6-4-19
DBE Handbook 6-4-19_
NDOT Mentor-Protege 7-24-19
DBE GFE
PNW Statement Tech Corrections
PNW Statement Tech Corrections
MAP21 2018
NDOT 2018-19 Title VI IP with corrected assurances
NDOT 2018 Transit Title VI Program-Corrected by Transit 11.26.18
NDOT-nondiscrimination-notice-to-the-public
DS Presentation
2017 NDOT DISPARITY STUDY_FINAL
NDOT Disparity Study Presentation Flyer
Title VI Complaint Form
Title VI Complaint Form (Spanish)
Title VI Procedures (Spanish)
Title VI Notice (spanish)
Title VI Notice to the Public
Title VI Complaint Procedures
Nevada DOT MAP21EthnicityGenderSummaryforDBEDirectory 2017
NDOT2017DBEPlanRevisions3.2018
TitleVIImplementationPlan3.2018
Title VI Complaint Form 3.2018
NO CHANGE AFFIDAVIT
Nevada Department of Transportation NAICS Code Expansion Request Form
NDOT 2017 DBE Plan Revisions Final 8.21.17
Affidavit of Certification
2015 NDOT Transit Title VI
Affidavit of Certification
Spousal Renunciation
NUCP Interstate Certification Affivadit
DBE Weekly Trucking Report form-fillable
DBE Yearly Trucking Firm Equipment List-fillable
DBE PNW Statement 11-3-2014
Protege Application
MOU, Mentor-Protege.doc
Mentor Application
Mentor-Protege Program
FTA Triennial DBE Goal Methodology 9.29.17
FTA Triennial DBE Goal Public Meeting Notice 9.2017
FTA Triennial DBE Goal Public Meeting Notice
9 Transition Plans
8 Disability Protections
7 Foundations of the ADA Section 504
6 Nondiscrimination Requirements on Construction Contracts
5 Compliance and Enforcement
4 Implementation Plans
3 Nondiscrimination Assurances
2 Background and Purpose
17 Evaluating a Commercially Useful Function (CUF)
16 Commercially Useful Function
15 Evaluating Good Faith Efforts
14 DBE Contract Goals
13 Prompt Payment and Return of Retainage
12 Project Contract Administration
11 Program Overview
10 Self-Evaluation Basics
1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
U:\web page information\NDOT 2017 DBE Plan Revisions Final 8.16.17
FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
4 Implementation Plans
3 Nondiscrimination Assurances
2 Background and Purpose
17 Evaluating a Commercially Useful Function (CUF)
16 Commercially Useful Function
15 Evaluating Good Faith Efforts
14 DBE Contract Goals
13 Prompt Payment and Return of Retainage
12 Project Contract Administration
11 Program Overview
10 Self-Evaluation Basics
1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
6 Nondiscrimination Requirements on Construction Contracts
5 Compliance and Enforcement
8 Disability Protections
7 Foundations of the ADA Section 504
9 Transition Plans
U:\web page information\LPA & MPO Agencies
U:\web page information\Chamber List
LPA & MPO Agencies
Chamber List
FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
C:\Users\jblack\Documents\Training\Office\onedrive-for-business
C:\Users\h9003jrd\Desktop\DBE from Terry\DBE Trucking
C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT DBE Plan Final 2016
C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT_Title_VI_Complaint_Procedure_and_Form_REV9-12
Title VI Implementation Plan Final Version 2016
Title VI Implementation Plan Final Version 2016
2017 NDOT DISPARITY STUDY_FINAL
I-15 South Corridor: Via Nobila Interchange
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project,
addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas
Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONS!) for the
overall project was approved by the Federal Highway Administration on April 20, 2009. In 2022, a reevaluation of
the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over
the last several years within the I-15 South project area.
I-15 South Corridor Improvement Project EA 2008
Project Overview
The Project is located on Interstate 15 (I-15) in Clark County, Nevada, and will consist of providing access to
the Inspirada Master Planned Community located in West Henderson, Nevada, east of the I-15. The Project
will include construction of a new interchange and extension of Via Nobila, west of Las Vegas Boulevard.
The DEPARTMENT intends to utilize a Design-Bid-Build (DBB) method for delivery of this Project. This
Project is a phase of the I-15 South Corridor and a National Environmental Policy Act (NEPA) Re-Evaluation
for this phase will be completed by the DEPARTMENT’s Environmental Division.
Project Purpose and Need
The project is to provide a grade separated interchange along I-15 at Via Nobila that currently terminates at
Las Vegas Boulevard. The secondary purpose of the project is to widen I-15 to alleviate traffic congestion
along I-15 and accommodate the proposed High-Speed Rail along the median. There were three interchange
alternatives studied to determine the most efficient system. Those included a tight diamond interchange,
single point urban interchange and a diverging diamond interchange.
The diverging diamond interchange was selected because of cost and traffic flow efficiency as depicted in
the following figure:
Funding
The total projected cost for construction is $100M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Bridge Formula Program (BFP), and State match funding.
Schedule
The project is currently progressing towards final design completion. Below is a general overview of the
design and construction schedule. The schedule is subject to change.
Final Design Completion: November 2028
Start Construction Phase: Q1 2029
Construction Phase Completion: Q1 2031
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876