Nevada Department of Transportation
Home MenuDocuments
- Henderson Interchange
Job#4577-TahoeBasinMap2023FullPage-v6
tahoe basin const map 2022 8.5x11
Henderson Interchange - Crash Analysis Report Final
tahoe basin const map 2022 8.5x11
NDOT Grant/Earmark Support Checklist
NDOT Sahara Safety Project FAQ Spanish FINAL
NDOT Sahara Safety Project FAQ FINAL
NDOT Sahara Safety Project Fact Sheet Spanish FINAL
NDOT Sahara Safety Project Fact Sheet FINAL
MtRoseCorridorPlan-Volume2_Apr2022-small
MtRoseCorridorPlan-Volume1_Apr2022-small (3)
US50 CMP - Round 2 Boards_24x36
April 2022 Upcoming Construction Projects
NDOT Sahara Avenue Safety Enhancement Project Fact Sheet March 2022.pdf FINAL
Revision_2 US50_Flyer
US50 CMP - Existing Conditions Memo_No_App
US50 CMP - Ex Cond Takeaways
NDOTUS395_ProjUpdate_2021 FINAL
Appendix H (1)
Appendix G
Appendix F (1)
Appendix E Combined
Appendix D Combined
Appendix C Combined_reduced
Appendix A Combined (1)
Appendix B Combined
NDOT_I-15 Flamingo-Sahara Feasibility Study_July 2021_FINAL_082521
2021-09_NDOT I-15_PEL_Questionnaire_and_Checklist_FINAL
NV I-515_Flier_Charleston final design
US50_Flyer
U.S. 50-Dayton fact sheet 5 10 2021 UPDATED
20200928 Winnemucca Interchanges LA FF
I-15 Tropicana Fact Sheet August 2020
I-15 Tropicana Interchange Phasing Narrative Memorandum 2 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum 1 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum -11-12-2019
Fact Sheet July 9 2020
0145Trop FULL SET 062420
nv-stip-2019
tahoe basin const map 2020 8.5x11
I-15 Tropicana EA - TSPR Final
I-15 Tropicana EA - TIAR Final
STIPFormalProcedureandGuid
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
Handout Packet 11-15-19 rev2
I-15-Tropicana public hearing public notice 11 19 2019 FINAL
A I-15 Tropicana Appendix A Public Information Meeting Summaries
D I-15 Tropicana Appendix D Change in Control of Access Request
C I-15 Tropicana Appendix C NDOT Traffic and Construction Noise Analysis and Abatement Policy
B I-15 Tropicana Appendix B SHPO Correspondence (1)
00c I-15 Tropicana Appendix B SHPO Correspondence
EA I-15 Tropicana EA 10152019
NDOT US395_Proj Update_2019 Summer_rev2
I15 Tropicana Public Meeting 2 Meeting Packet FINAL
I15 Tropicana Fact Sheet 9 2019
Gemfield Groundbreaking Aug 2
U.S. 395 North Valleys Fact Sheet Updated May 2019
U.S. 395 North Valleys Citiens Advisory Board Presentation May 2019
C:\Users\h9003mmm\Documents\Marketing Ideas\I-580 Exit Number Flyer
NDOT US395_Proj Update_2019 Spring
Safety and Operational Improvements for US 50 Phase 2
ONYX-BOWERS-Display
US 50 Display from Roys Road to Hackberry Street
US 50 Display from Hackberry Street to Silver Springs
Roundabout at Silver Springs
I-11 PEL Questionnaire and Checklist_02-01-19
I-11 Executive Summary 2018
December 2018 Alternatives Analysis Report
December 2018 I-11 Public Outreach Summary
C:\Users\h1003aep\Desktop\I-15 CC215 Welcome Packet
C:\Users\h1003aep\Downloads\NDOT I-15 CC215 N Phase 4 Public Meeting PPT_12-4-18
C:\Users\h1003aep\Downloads\I-15 CC215 Welcome Packet
Draft I-11_PEL_Questionnaire_and_Checklist_Questionnaire_11-11-18
I-11 Stakeholder Meeting October 2018 Webinar Slides
I-11 Resource Agency Meeting October 2018 Webinar Slides
Preliminary I-515 Southband Lane Drop Elimination & Auxiliary Lane Renderings
C:\Users\h1003aep\Desktop\SB 515 lane drop
SR 28 Closure Flyer
I-11 NNAA_Public Outreach 2018_v24
Appendix A -11 NNAA Outreach Summary DRAFT - October 2018
I11NNAA_Alternatives Analysis_2018-10-08
Appendix G - I11 NNAA - Implementation Strategies
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
I-11_NNAA_Board_Summer2018_AlternativesMap
I-11 NNAA_Public Outreach 2018_v17
I-11 NNAA - Pub Mtg 2 Handout
FFY19 STIP Process DRAFT_AugBoard_7-18-2018
I11NNAA_Alternatives Analysis Memo-DRAFT_2018_07_18
AppF_I11NNAA_Connectivity-North-I80
AppE_I11NNAA_EnvironmentalDetails
AppD_I11NNAA_Transportation_Plans
AppC_I11NNAA_Impacts-of-Bypasses
AppB_I11NNAA_ED-questionnaire
Ely Fact Sheet July 2018
I-11 Meeting Flyer
I-11 Frequently Asked Questions - June 2018
I-11 NNAA_Methodology Memo March 2018
I11NNAA_PublicOutreach2018
I-11 NNAA_Impacts of Bypasses_2018-05
I-11 NNAA_Connectivity North I-80_2018-05
I-11 NNAA - Phase 1 Outreach Summary-Draft
Birds Eye View of Starr Interchange
Tahoe Basin Construction Information
NDOT Nellis Road Improvement Project FAQ 2018
NDOT Nellis Road Improvement Project DRAFT of PI Plan
07. Map Board_031618
06. I-11_NNAA_Alt Corridors Plot
05. I-11 NNAA - Pub Mtg 1 Handout
04. I-11 NNAA_Presentation - Public Mtg 1 Slides
03. I-11 NN PEL - Stakeholder Mtg 1
I-11 NNAA_Public Outreach 2018_v130
DRAFT of I-11 North NV - Methodology Memo - 2018-03-02
Garnet Interchange Fact Sheet 2018
final I-15 Tropicana Fact Sheet
Final Report 12-30-2015
Appendix 9 – TDI 3 Levels – DM TDI ALT1_BASE_CONFIGA1_36x48
Appendix 8 – I-15_Tropicana Traffic Report_Interchange Analysis-Final Report122915 signed
Appendix 7 – I-15 Tropicana Alternatives Selection Meeting
Appendix 6 – I-15 Tropicana Alternatives Screening Meeting
Appendix 5 – Tropicana Exit Concept Memo FINAL
Appendix 4 – Interim Concepts Memo Review 9-21-15 Final
Appendix 3 – Initial Concepts Report FINAL
Appendix 2 – Traffic Forecasting Memorandum (Methodology Memo attached)
Appendix 1 – CORSIM Calibration Memo (Methodology Memo in Attachment 1)
Appendix 17 – I-15-Tropicana_PEL_Questionnaire_and_Checklist_Nevada_v5
Appendix 16 – Golden Palm
Appendix 15 – Public Open House Summary
Appendix 14 – Public Meeting Materials
Appendix 13 – Public Open House Advertisements
Appendix 12 – Fact Sheet
Appendix 11 – Seering Committee Meeting Minutes
Appendix 10 – TDI 3 LEVEL TROP FINAL 2015 WIZARD SUMMARY
NDOT_NWcorrPh3A-3E_improv_handout_20170927
NDOT_NWcorrPh2B-5_improv_handout_20170928
FTA Transit NDOT 3 Year Goal Methodology 2017
USAPkwy_FactSheet[10] Spring 2017
USA Parkway PerspectiveViews
I-15 South Project: Sloan Road to North of Warm Springs Road
Construction underway through December 2025
Project Overview
The Nevada Department of Transportation (NDOT) began improvements along nearly nine miles of Interstate 15 (I-15) South from Sloan Road to north of Warm Springs Road in January 2024. This Project will aid in improving travel-time reliability, serve proposed growth in the area by increasing local mobility and access, and enhance I-15’s operational efficiency. Construction is anticipated to be completed within a 24-month period.
Project features include:
- Widening I-15 from six to eight general-purpose lanes between Sloan Road and St. Rose Parkway
- Widening and restriping I-15 from six to 11 general-purpose lanes between St. Rose Parkway and Blue Diamond Road
- Resurfacing bridges and pavement preservation at the Blue Diamond Interchange
- Construction of 6 new sound walls near qualifying residential areas throughout the corridor
Current and Upcoming Restrictions
Nightly (8:00 p.m. to 5:00 a.m.) Sunday, Nov. 16 to Wednesday, Nov. 19 (3 nights):
- North and southbound I-15 reduced to two lanes between Starr Ave and Sloan Rd
Funding
The total cost for construction is $81 M. The project is paid for with 95% federal and 5% state funds. Funding sources include National Highway Performance Program (NHPP), Surface Transportation Block (STBG) and PROTECT Program grants, and state gas tax.
Contractor
Fisher Industries
Schedule
Below is a general overview of the construction schedule. The schedule is subject to change.
January-June 2024 (Complete):
- Earthwork and widening SB I-15 from St. Rose Pkwy. to Sloan Rd.
- Earthwork and widening SB I-15 from St. Rose
- Concrete grinding at the Sloan Rd. interchange
- Drainage and electrical improvements
- Bridge resurfacing at Blue Diamond Rd.
- Begin forming sound walls
July-December 2024 (Complete):
- Drainage and electrical improvements
- Forming sound walls
- Installing overhead signs
- Rock landscaping
- Fence and guard rail installation
January-June 2025 (Complete):
- Earthwork and widening NB I-15 from Cactus Ave. to Silverado Ranch Blvd.
- Earthwork and widening SB Blue Diamond Rd to Silverado Ranch Blvd.
- Earthwork and widening both SB and NB I-15 from St. Rose Pkwy. to Silverado Ranch Blvd.
- Earthwork and widening NB I-15 from Sloan Rd. to St. Rose Pkwy.
- Drainage and electrical improvements
- Forming sound walls
- Rock landscaping
- Fence and guard rail installation
- Installing overhead signs
July-December 2025:
- Mill and fill existing asphalt NB and SB from Warm Springs Rd. to Sloan Rd.
- Electrical improvements
- Rock landscaping
- Fence and guard rail installation
Traffic Control
Project working hours are nightly, Sunday nights starting at 8 p.m. through Friday evenings at 5 p.m.
- Drivers can expect lane shifts and lane reductions to occur with a reduced speed of 55 MPH.
- During daytime hours, Monday-Friday from 5 a.m. to 8 p.m., three lanes of traffic will be maintained in each direction.
- Traffic will be reduced to one lane of traffic in each direction nightly, Sunday-Friday 8 p.m. to 5 a.m.
Project Background
In 2008, an Environmental Assessment (EA) was prepared for the I-15 South Corridor Improvement Project, addressing the environmental effects of improvements along the I-15 corridor, including a portion of Las Vegas Boulevard South, between Sloan Road and Tropicana Avenue. A Finding of No Significant Impact (FONSI) for the overall project was approved by the Federal Highway Administration on April 20, 2009.
In 2022, a reevaluation of the I-15 South EA and FONSI was done to consider changing conditions and new issues that have transpired over the last several years within the I-15 South project area. The reevaluation of effects of the Phase 2 improvements was approved by FHWA and the project immediately moved forward into design. Design plans were finalized in the summer of 2023.
I-15 South Corridor Improvement Project EA_2008
Public Meeting Presentation_November 2022
Contact
NDOT Project Manager: Mauricio Cardenas, P.E.
mcardenas@dot.nv.gov
(702) 671-8876
NDOT Acting Resident Engineer: Shawn Meagher
shawn.meagher@constructnv.com
(702) 481-2362
For noise complaints, please contact Kevin Van Riel with Fisher Industries at (702) 219-3375 or kvanriel@fisherind.com.
