Nevada Department of Transportation
Home MenuDocuments
RSB Preferred Alternative 2 2023 Compressed
Reno-SBX_Flier_Fact-Sheet-map353048-1
RSB_ROD_Final
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_G_RTC_Part3 (1)
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report (1)
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Section 3.14 Commitments of Resources
FEIS_Section 3.13 Uses Versus Productivity
FEIS_Section 3.12 Indirect and Cumulative
FEIS_Section 3.11 Cultural Resources
FEIS_Chapter 6 Section 4f Evaluation
FEIS_Chapter 5 List of Preparers
FEIS_Chapter 4 Public Involvement
FEIS_Section 3.9 Vegetation Wildlife Fish
FEIS_Section 3.8 Water Resources
FEIS_Section 3.7 Visual Character
FEIS_Section 3.6 Transportation Services
FEIS_Section 3.10 Hazardous Materials
FEIS_Section 3.5 Air Quality
FEIS_Section 3.4 Traffic Noise
FEIS_Section 3.3 Environmental Justice
FEIS_Section 3.2 Community Resources
FEIS_Section 3.1 Introduction
FEIS_Front Matter
FEIS_Executive Summary
FEIS_Cover Signature Abstract
FEIS_Chapter 2 Alternatives
FEIS_Chapter 1 Project Need
Searchlight U.S. 95 Roadway Rehabilitation
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a roadway rehabilitation project on U.S. Highway 95 in Clark County, improving approximately 20.41 miles from Milepost 17.442 to Milepost 37.849 near Searchlight. Work is expected to enhance roadway conditions and safety while extending the lifespan of this key transportation corridor.
The project scope includes milling and paving, new signage and striping, hydraulic and drainage enhancements, fence repair, and tortoise fencing to protect local wildlife. These enhancements will contribute to safer and more efficient travel for motorists along this arterial route, which serves both commuter and freight traffic.
Current Restrictions
A 24/7 work zone traffic control setup will reduce U.S. 95 to one lane in each direction for the remainder of the project. Traffic control will be implemented in a five-mile moving setup.
Daily (5:00 a.m. to 5:00 p.m.) Monday-Fridays, March 10 to November 25:
- Milling and paving operations on U.S. 95 between Milepost 17.442 and Milepost 37.849
- Tuesday, March 11 – Wednesday, March 12: No work will take place
- Traffic control will be lifted during special events and holidays
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
