Nevada Department of Transportation
Home MenuDocuments
- Reports
- Final Environmental Impact Statement
- I-515 ADS
- Naturally Occurring Asbestos Information
- NOS Phase Reports
- Carson City Freeway
- USA Parkway Reports
FFY23 DRAFT Annual Work Program
FFY23 - FFY26 DRAFT STIP
STIP Q3 2022 (21-25)
20 year forecast for STIP 2017 FY 2016 actuals v2
RFQ 432-16-110 - Garnet Design-Build Project - Conceptual Plans
Powerpoint Garnet Public Info Mtg 100616
US95NW_project_map
US95NW_Project_Management_Plan
US95NW_Financial_Plan
US 95-CC 215 Interchange (Phase 3) Map
US 95 NW Phase 2A Roadway Improvements Map
US 95 NW Phase 2 Landscape and Aesthetics Rendering
US 95 NW Environmental ReEvaluation
US 95 NW Corridor Improvements Overview Map
Phasing Displays 3-10-16
USAPkwy FactSheet6 02142015
USAHandout_final(jm)8-8-16
USA Pkwy PIM ppt 8-3-16 FINAL
US95_Newsletter_May2015
US 95 Nov 2015 Meeting Packet_Print (1)
Phasing Displays 3-10-16(1)
Phasing Displays 3-10-16
NDOTnewsad_2015_4.9x6.75_rev
I-15 EA102208 -2-Appendices
I-15 EA102208 -1-Report
Final Starr Handouts
STARR FAQ V3
Fact Sheet-Spring 2016
TahoeBasin2015
tahoe basin const map 2017
Carson City Freeway
SR28-July-26-PIM-Packet_v2
SR-28-Flyer-Public-Hearing-042616
SR 28 Fact Sheet FINAL(1)
SR 28 Fact Sheet FINAL
sr 28 cmp for web-131004
Project News for the Community Volume 1 Issue 2
Project News for the Community Volume 1 Issue 1
EA North Demonstration Project(1)
Reno Spaghetti Bowl Charrette Report_Final red
Charrette Report Appendix_Final red
Kietzke SMP Priority 2-3
Kietzke Safety Management Plan Presentation
Kietzke Safety Management Plan PDF
Kietzke Lane Safety Management Plan Full Report Appendix
Kietzke Lane Safety Management Plan Final Report
Kietzke Lane Public Meeting Presention Feb 21, 2013
Kietzke Lane Public Meeting No. 2 Handout
Kietzke Lane Priority 1 Recommendations
Kietzke Lane Pedestrian Bike Crash Data
Kietzke Lane Crash Type Graph
Kietzke Lane Crash Severity Graph
CLV 515-Charleston Feasiblity Study Rev 4 signed
515 Factsheet Option 3
515 Charleston (final)Handouts Sep 22
BCBypassRod
RR_Pass_Intg
3580Rendering
Searchlight U.S. 95 Roadway Rehabilitation
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a roadway rehabilitation project on U.S. Highway 95 in Clark County, improving approximately 20.41 miles from Milepost 17.442 to Milepost 37.849 near Searchlight. Work is expected to enhance roadway conditions and safety while extending the lifespan of this key transportation corridor.
The project scope includes milling and paving, new signage and striping, hydraulic and drainage enhancements, fence repair, and tortoise fencing to protect local wildlife. These enhancements will contribute to safer and more efficient travel for motorists along this arterial route, which serves both commuter and freight traffic.
