Nevada Department of Transportation
Home MenuDocuments
NDOT 2025 FHWA Title VI Plan - as submitted
Key Changes Under the IFR
DBE IFR.Signed.9-30-2025
DBE IFR Guidance.9-30-2025
Personal Narrative – Example Construction
Personal Narrative Example Non-Construction
NDOT 2025 FHWA Title VI Plan - as submitted
Example PN for individual showing of disadvantage Small Business
Example PN for individual showing of disadvantage Women
Example PN for individual showing of disadvantage Minority
Example PN for individual showing of disadvantage LGBTQ
Example PN for individual showing of disadvantage Female Minority
Example PN for individual showing of disadvantage Caucasian Male
NDOT 26-28 Triennial DBE Goal Presentation Public Meeting Notice
2026-2028 Triennial DBE Goal Public Information Meeting
FFY25_Title_VI_Plan_Complete (1)
NDOT_DBE_Plan_8.20.24 Signed
NDOT DBE Plan 8.20.24
Title VI Complaint Form
NDOT_DBE_Plan_8.20.24
FFY25_Title_VI_Plan_Complete signed
guide-for-writing-a-social-disadvantage-narrative
NDOT LAP 2024
DBE Cover Letter Template Nevada
Personal Net Worth Statement 4.9.2024
UCA 4.09.2024
DECLARATION OF ELIGIBILITY 4.9.2024
DBE Performance Plan Considerations
NUCP Interstate Certification Affid
Title VI Complaint Form
NDOT nondiscrimination notice
DBE Plan 8.2023 signed
DBE Plan 8.2023
Title VI Complaint Form Spanish (TÍTULO VI FORMULARIO DE QUEJA DE DISCRIMINACIÓN)
NOTICE FTA DBE Goal
2023-2025 FTATriennialDBEGoal info for posting
2023 LAP
NDOT Limited English Proficiency Plan
NDOT 2024 Title VI Implementation Plan Complete
NDOT Goal Methodology FFYS 2023-2025 Final 7.26.22
Nevada Department of Transportation Disparity Study 2021
NDOT Disparity Study Presentation 5-24-22
2023-2025 Triennial DBE Goal Public Information Meeting
2022 ADA Field Guide
FTA_Title_VI_for_NDOT_9.14.21
NDOT 2023-25 Triennial DBE Goal Presentation Public Meeting Notice
NDOT 2021-2023 FTATriennialDBEGoalMethodology with noted changes
2021-2023 FTATriennialDBEGoalMethodology 2.17.21
2021-2023 FTATriennialDBEGoalMethodo
FFY 2021 Title VI Implementation Plan Complete
NOTICE
FTATriennialDBEGoalMethodo
NDOT Goal Methodology FFYS 2020-2022
NDOT FTA DBE Plan Oct 2019
DBE Handbook 6-4-19_
Orientation, 8-27-19
NDOT DBE Orientation 6-4-19
DBE Handbook 6-4-19_
NDOT Mentor-Protege 7-24-19
DBE GFE
PNW Statement Tech Corrections
PNW Statement Tech Corrections
MAP21 2018
NDOT 2018-19 Title VI IP with corrected assurances
NDOT 2018 Transit Title VI Program-Corrected by Transit 11.26.18
NDOT-nondiscrimination-notice-to-the-public
DS Presentation
2017 NDOT DISPARITY STUDY_FINAL
NDOT Disparity Study Presentation Flyer
Title VI Complaint Form
Title VI Complaint Form (Spanish)
Title VI Procedures (Spanish)
Title VI Notice (spanish)
Title VI Notice to the Public
Title VI Complaint Procedures
Nevada DOT MAP21EthnicityGenderSummaryforDBEDirectory 2017
NDOT2017DBEPlanRevisions3.2018
TitleVIImplementationPlan3.2018
Title VI Complaint Form 3.2018
NO CHANGE AFFIDAVIT
Nevada Department of Transportation NAICS Code Expansion Request Form
NDOT 2017 DBE Plan Revisions Final 8.21.17
Affidavit of Certification
2015 NDOT Transit Title VI
Affidavit of Certification
Spousal Renunciation
NUCP Interstate Certification Affivadit
DBE Weekly Trucking Report form-fillable
DBE Yearly Trucking Firm Equipment List-fillable
DBE PNW Statement 11-3-2014
Protege Application
MOU, Mentor-Protege.doc
Mentor Application
Mentor-Protege Program
FTA Triennial DBE Goal Methodology 9.29.17
FTA Triennial DBE Goal Public Meeting Notice 9.2017
FTA Triennial DBE Goal Public Meeting Notice
9 Transition Plans
8 Disability Protections
7 Foundations of the ADA Section 504
6 Nondiscrimination Requirements on Construction Contracts
5 Compliance and Enforcement
4 Implementation Plans
3 Nondiscrimination Assurances
2 Background and Purpose
17 Evaluating a Commercially Useful Function (CUF)
16 Commercially Useful Function
15 Evaluating Good Faith Efforts
14 DBE Contract Goals
13 Prompt Payment and Return of Retainage
12 Project Contract Administration
11 Program Overview
10 Self-Evaluation Basics
1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
U:\web page information\NDOT 2017 DBE Plan Revisions Final 8.16.17
FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
4 Implementation Plans
3 Nondiscrimination Assurances
2 Background and Purpose
17 Evaluating a Commercially Useful Function (CUF)
16 Commercially Useful Function
15 Evaluating Good Faith Efforts
14 DBE Contract Goals
13 Prompt Payment and Return of Retainage
12 Project Contract Administration
11 Program Overview
10 Self-Evaluation Basics
1 Overview of FHWA’s Civil Rights Program Requirements for Local Public Agencies
6 Nondiscrimination Requirements on Construction Contracts
5 Compliance and Enforcement
8 Disability Protections
7 Foundations of the ADA Section 504
9 Transition Plans
U:\web page information\LPA & MPO Agencies
U:\web page information\Chamber List
LPA & MPO Agencies
Chamber List
FTA Transit NDOT 3 Year Goal Submittal 2017 Revised 8.17.2017
C:\Users\jblack\Documents\Training\Office\onedrive-for-business
C:\Users\h9003jrd\Desktop\DBE from Terry\DBE Trucking
C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT DBE Plan Final 2016
C:\Users\h9003jrd\Desktop\DBE from Terry\NDOT_Title_VI_Complaint_Procedure_and_Form_REV9-12
Title VI Implementation Plan Final Version 2016
Title VI Implementation Plan Final Version 2016
2017 NDOT DISPARITY STUDY_FINAL
Searchlight U.S. 95 Roadway Rehabilitation
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a roadway rehabilitation project on U.S. Highway 95 in Clark County, improving approximately 20.41 miles from Milepost 17.442 to Milepost 37.849 near Searchlight. Work is expected to enhance roadway conditions and safety while extending the lifespan of this key transportation corridor.
The project scope includes milling and paving, new signage and striping, hydraulic and drainage enhancements, fence repair, and tortoise fencing to protect local wildlife. These enhancements will contribute to safer and more efficient travel for motorists along this arterial route, which serves both commuter and freight traffic.
Current Restrictions
A 24/7 work zone traffic control setup will reduce U.S. 95 to one lane in each direction for the remainder of the project. Traffic control will be implemented in a five-mile moving setup.
Daily (5:00 a.m. to 5:00 p.m.) Monday-Fridays, March 10 to December 12:
- Milling and paving operations on U.S. 95 between Milepost 17.442 and Milepost 37.849
- Traffic control will be lifted during special events and holidays
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
