Nevada Department of Transportation
Home MenuDocuments
- Henderson Interchange
Job#4577-TahoeBasinMap2023FullPage-v6
tahoe basin const map 2022 8.5x11
Henderson Interchange - Crash Analysis Report Final
tahoe basin const map 2022 8.5x11
NDOT Grant/Earmark Support Checklist
NDOT Sahara Safety Project FAQ Spanish FINAL
NDOT Sahara Safety Project FAQ FINAL
NDOT Sahara Safety Project Fact Sheet Spanish FINAL
NDOT Sahara Safety Project Fact Sheet FINAL
MtRoseCorridorPlan-Volume2_Apr2022-small
MtRoseCorridorPlan-Volume1_Apr2022-small (3)
US50 CMP - Round 2 Boards_24x36
April 2022 Upcoming Construction Projects
NDOT Sahara Avenue Safety Enhancement Project Fact Sheet March 2022.pdf FINAL
Revision_2 US50_Flyer
US50 CMP - Existing Conditions Memo_No_App
US50 CMP - Ex Cond Takeaways
NDOTUS395_ProjUpdate_2021 FINAL
Appendix H (1)
Appendix G
Appendix F (1)
Appendix E Combined
Appendix D Combined
Appendix C Combined_reduced
Appendix A Combined (1)
Appendix B Combined
NDOT_I-15 Flamingo-Sahara Feasibility Study_July 2021_FINAL_082521
2021-09_NDOT I-15_PEL_Questionnaire_and_Checklist_FINAL
NV I-515_Flier_Charleston final design
US50_Flyer
U.S. 50-Dayton fact sheet 5 10 2021 UPDATED
20200928 Winnemucca Interchanges LA FF
I-15 Tropicana Fact Sheet August 2020
I-15 Tropicana Interchange Phasing Narrative Memorandum 2 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum 1 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum -11-12-2019
Fact Sheet July 9 2020
0145Trop FULL SET 062420
nv-stip-2019
tahoe basin const map 2020 8.5x11
I-15 Tropicana EA - TSPR Final
I-15 Tropicana EA - TIAR Final
STIPFormalProcedureandGuid
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
Handout Packet 11-15-19 rev2
I-15-Tropicana public hearing public notice 11 19 2019 FINAL
A I-15 Tropicana Appendix A Public Information Meeting Summaries
D I-15 Tropicana Appendix D Change in Control of Access Request
C I-15 Tropicana Appendix C NDOT Traffic and Construction Noise Analysis and Abatement Policy
B I-15 Tropicana Appendix B SHPO Correspondence (1)
00c I-15 Tropicana Appendix B SHPO Correspondence
EA I-15 Tropicana EA 10152019
NDOT US395_Proj Update_2019 Summer_rev2
I15 Tropicana Public Meeting 2 Meeting Packet FINAL
I15 Tropicana Fact Sheet 9 2019
Gemfield Groundbreaking Aug 2
U.S. 395 North Valleys Fact Sheet Updated May 2019
U.S. 395 North Valleys Citiens Advisory Board Presentation May 2019
C:\Users\h9003mmm\Documents\Marketing Ideas\I-580 Exit Number Flyer
NDOT US395_Proj Update_2019 Spring
Safety and Operational Improvements for US 50 Phase 2
ONYX-BOWERS-Display
US 50 Display from Roys Road to Hackberry Street
US 50 Display from Hackberry Street to Silver Springs
Roundabout at Silver Springs
I-11 PEL Questionnaire and Checklist_02-01-19
I-11 Executive Summary 2018
December 2018 Alternatives Analysis Report
December 2018 I-11 Public Outreach Summary
C:\Users\h1003aep\Desktop\I-15 CC215 Welcome Packet
C:\Users\h1003aep\Downloads\NDOT I-15 CC215 N Phase 4 Public Meeting PPT_12-4-18
C:\Users\h1003aep\Downloads\I-15 CC215 Welcome Packet
Draft I-11_PEL_Questionnaire_and_Checklist_Questionnaire_11-11-18
I-11 Stakeholder Meeting October 2018 Webinar Slides
I-11 Resource Agency Meeting October 2018 Webinar Slides
Preliminary I-515 Southband Lane Drop Elimination & Auxiliary Lane Renderings
C:\Users\h1003aep\Desktop\SB 515 lane drop
SR 28 Closure Flyer
I-11 NNAA_Public Outreach 2018_v24
Appendix A -11 NNAA Outreach Summary DRAFT - October 2018
I11NNAA_Alternatives Analysis_2018-10-08
Appendix G - I11 NNAA - Implementation Strategies
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
I-11_NNAA_Board_Summer2018_AlternativesMap
I-11 NNAA_Public Outreach 2018_v17
I-11 NNAA - Pub Mtg 2 Handout
FFY19 STIP Process DRAFT_AugBoard_7-18-2018
I11NNAA_Alternatives Analysis Memo-DRAFT_2018_07_18
AppF_I11NNAA_Connectivity-North-I80
AppE_I11NNAA_EnvironmentalDetails
AppD_I11NNAA_Transportation_Plans
AppC_I11NNAA_Impacts-of-Bypasses
AppB_I11NNAA_ED-questionnaire
Ely Fact Sheet July 2018
I-11 Meeting Flyer
I-11 Frequently Asked Questions - June 2018
I-11 NNAA_Methodology Memo March 2018
I11NNAA_PublicOutreach2018
I-11 NNAA_Impacts of Bypasses_2018-05
I-11 NNAA_Connectivity North I-80_2018-05
I-11 NNAA - Phase 1 Outreach Summary-Draft
Birds Eye View of Starr Interchange
Tahoe Basin Construction Information
NDOT Nellis Road Improvement Project FAQ 2018
NDOT Nellis Road Improvement Project DRAFT of PI Plan
07. Map Board_031618
06. I-11_NNAA_Alt Corridors Plot
05. I-11 NNAA - Pub Mtg 1 Handout
04. I-11 NNAA_Presentation - Public Mtg 1 Slides
03. I-11 NN PEL - Stakeholder Mtg 1
I-11 NNAA_Public Outreach 2018_v130
DRAFT of I-11 North NV - Methodology Memo - 2018-03-02
Garnet Interchange Fact Sheet 2018
final I-15 Tropicana Fact Sheet
Final Report 12-30-2015
Appendix 9 – TDI 3 Levels – DM TDI ALT1_BASE_CONFIGA1_36x48
Appendix 8 – I-15_Tropicana Traffic Report_Interchange Analysis-Final Report122915 signed
Appendix 7 – I-15 Tropicana Alternatives Selection Meeting
Appendix 6 – I-15 Tropicana Alternatives Screening Meeting
Appendix 5 – Tropicana Exit Concept Memo FINAL
Appendix 4 – Interim Concepts Memo Review 9-21-15 Final
Appendix 3 – Initial Concepts Report FINAL
Appendix 2 – Traffic Forecasting Memorandum (Methodology Memo attached)
Appendix 1 – CORSIM Calibration Memo (Methodology Memo in Attachment 1)
Appendix 17 – I-15-Tropicana_PEL_Questionnaire_and_Checklist_Nevada_v5
Appendix 16 – Golden Palm
Appendix 15 – Public Open House Summary
Appendix 14 – Public Meeting Materials
Appendix 13 – Public Open House Advertisements
Appendix 12 – Fact Sheet
Appendix 11 – Seering Committee Meeting Minutes
Appendix 10 – TDI 3 LEVEL TROP FINAL 2015 WIZARD SUMMARY
NDOT_NWcorrPh3A-3E_improv_handout_20170927
NDOT_NWcorrPh2B-5_improv_handout_20170928
FTA Transit NDOT 3 Year Goal Methodology 2017
USAPkwy_FactSheet[10] Spring 2017
USA Parkway PerspectiveViews
Searchlight U.S. 95 Roadway Rehabilitation
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a roadway rehabilitation project on U.S. Highway 95 in Clark County, improving approximately 20.41 miles from Milepost 17.442 to Milepost 37.849 near Searchlight. Work is expected to enhance roadway conditions and safety while extending the lifespan of this key transportation corridor.
The project scope includes milling and paving, new signage and striping, hydraulic and drainage enhancements, fence repair, and tortoise fencing to protect local wildlife. These enhancements will contribute to safer and more efficient travel for motorists along this arterial route, which serves both commuter and freight traffic.
Current Restrictions
A 24/7 work zone traffic control setup will reduce U.S. 95 to one lane in each direction for the remainder of the project. Traffic control will be implemented in a five-mile moving setup.
Daily (5:00 a.m. to 5:00 p.m.) Monday-Fridays, March 10 to December 12:
- Milling and paving operations on U.S. 95 between Milepost 17.442 and Milepost 37.849
- Traffic control will be lifted during special events and holidays
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
