Nevada Department of Transportation
Home MenuDocuments
- Design
- Environmental Services
- Location Services
- Project Management
- Right-of-Way
- Structures Manual
2018 MS4 Permit SWMP Plan_Revised_June of 2024_All_R
SWMP Plan_Revised_November of 2022_All_R
MILEPOST_MARKERS_Shapefile
NV_ROADS_Shapefile
english_2010sm
english_2007sm
NV_Roads_Metadata
NV_MileMarkers_Metadata
NV_MileMarkers_and_Roads.gdb
nv.fhwa.federal aid highway program in nevada.pa.24oct14 ocr
STP 1 DRAFT 5-14-2015 Clean Copy
NDOTCR Handbook Final 4_10_13 version dated 8_5_14 CLEAN version reduced
3-D scanning paleograsshopper poster
2015 NDOT PA Annual Report
Terms Condition 021214
NRS_408
Item 9
Item 8
Item 7
Item 6
Item 5
Item 4
Item 3
Item 2
Item 11
Item 10
Item 1
State Owned Leased Property
Property Inventory
Leases for State Use
AB404[1]
ROW Buy America Policy 8-31-16
Relocation Assistance In Nevada 2012
Nevada Highways and Your Property(1)
NDOT_Right-of-Way_Manual_2011(1)
Upcoming_Construction_Projects
SafeTech Corridor Project
Project Overview
The Nevada Department of Transportation (NDOT), in partnership with the Regional Transportation Commission of Southern Nevada (RTC), began construction on the I-11 SafeTech Corridor Project on Sunday, May 31, 2026. The initiative will expand advanced traffic management technology along approximately five miles of Interstate 11 (I-11)/U.S. Route 95 (U.S. 95) between Summerlin Parkway and the Spaghetti Bowl interchange.
The approximately $22 million project, funded through a combination of federal, state, regional, and local transportation funding sources, is designed to improve real-time traffic operations, congestion management, and roadway safety along one of southern Nevada’s busiest freeway corridors.
Major project improvements include:
- Seven Active Traffic Management (ATM) gantries capable of displaying real-time speed, lane use, and incident messaging.
- 12 Wrong-Way Driver Alert Systems at six interchange locations: Martin Luther King Boulevard, Rancho Drive, Valley View Boulevard, Decatur Boulevard, Jones Boulevard, and Rainbow Boulevard, with two systems installed at each interchange.
- Two Strategic Traffic Management Sites for law enforcement and incident response operations.
- Additional intelligent transportation systems (ITS) infrastructure to support system integration and future traffic management operations.
Project Map
Project Website
NDOT has created a specific website for this project, which includes scheduling and traffic-control information. Visit www.ndotsafetech.com for more information.
