Nevada Department of Transportation
Home MenuDocuments
RSB Preferred Alternative 2 2023 Compressed
Reno-SBX_Flier_Fact-Sheet-map353048-1
RSB_ROD_Final
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_G_RTC_Part3 (1)
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report (1)
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Section 3.14 Commitments of Resources
FEIS_Section 3.13 Uses Versus Productivity
FEIS_Section 3.12 Indirect and Cumulative
FEIS_Section 3.11 Cultural Resources
FEIS_Chapter 6 Section 4f Evaluation
FEIS_Chapter 5 List of Preparers
FEIS_Chapter 4 Public Involvement
FEIS_Section 3.9 Vegetation Wildlife Fish
FEIS_Section 3.8 Water Resources
FEIS_Section 3.7 Visual Character
FEIS_Section 3.6 Transportation Services
FEIS_Section 3.10 Hazardous Materials
FEIS_Section 3.5 Air Quality
FEIS_Section 3.4 Traffic Noise
FEIS_Section 3.3 Environmental Justice
FEIS_Section 3.2 Community Resources
FEIS_Section 3.1 Introduction
FEIS_Front Matter
FEIS_Executive Summary
FEIS_Cover Signature Abstract
FEIS_Chapter 2 Alternatives
FEIS_Chapter 1 Project Need
SafeTech Corridor Project
Project Overview
The Nevada Department of Transportation (NDOT), in partnership with the Regional Transportation Commission of Southern Nevada (RTC), began construction on the I-11 SafeTech Corridor Project on Sunday, May 31, 2026. The initiative will expand advanced traffic management technology along approximately five miles of Interstate 11 (I-11)/U.S. Route 95 (U.S. 95) between Summerlin Parkway and the Spaghetti Bowl interchange.
The approximately $22 million project, funded through a combination of federal, state, regional, and local transportation funding sources, is designed to improve real-time traffic operations, congestion management, and roadway safety along one of southern Nevada’s busiest freeway corridors.
Major project improvements include:
- Seven Active Traffic Management (ATM) gantries capable of displaying real-time speed, lane use, and incident messaging.
- 12 Wrong-Way Driver Alert Systems at six interchange locations: Martin Luther King Boulevard, Rancho Drive, Valley View Boulevard, Decatur Boulevard, Jones Boulevard, and Rainbow Boulevard, with two systems installed at each interchange.
- Two Strategic Traffic Management Sites for law enforcement and incident response operations.
- Additional intelligent transportation systems (ITS) infrastructure to support system integration and future traffic management operations.
Project Map
Project Website
NDOT has created a specific website for this project, which includes scheduling and traffic-control information. Visit www.ndotsafetech.com for more information.
