Nevada Department of Transportation
Home MenuDocuments
- Transit Plans and Resources
- 5304 Grant
- 5310 Grant
- 5311 Grant
- 5339 Grant
Transit Brochure(1) MASTER
NV TAM Plan 2018
NDOT-Rural Transit 5310 Grant Application_Section-2
Grant Application FAQ
State Management Plan_2024
Rural Transit Application Guidance Document FFY26_Update_02.05.25
NDOT-Rural Transit 5339 FFY26 Grant Application-Section-2
NDOT-Rural Transit 5339 FFY26 Grant Application-Section-1
NDOT-Rural Transit 5311 FFY26 Grant Application_Section-2
NDOT-Rural Transit 5311 FFY26 Grant Application_Section-1
NDOT-Rural Transit 5310 FFY26 Grant Application_Section-2
NDOT-Rural Transit 5310 FFY26 Grant Application_Section-1
Grant Application FAQs FFY2026
Rural Transit Grant Management Training 9.17.24
NDOT Transit Award Methodology Memo
Flyer_NDOT-TransitPlan_v6
2019-12-30 TRIC Circulation Options Summary FINAL
2019-12-30 TMA Executive Summary
2019-05-30 Tech Memo #3 with Appendices
2019-02-12 Tech Memo #2
2018-11-01 Tech Memo 1
SafeTech Corridor Project
Project Overview
The Nevada Department of Transportation (NDOT), in partnership with the Regional Transportation Commission of Southern Nevada (RTC), began construction on the I-11 SafeTech Corridor Project on Sunday, May 31, 2026. The initiative will expand advanced traffic management technology along approximately five miles of Interstate 11 (I-11)/U.S. Route 95 (U.S. 95) between Summerlin Parkway and the Spaghetti Bowl interchange.
The approximately $22 million project, funded through a combination of federal, state, regional, and local transportation funding sources, is designed to improve real-time traffic operations, congestion management, and roadway safety along one of southern Nevada’s busiest freeway corridors.
Major project improvements include:
- Seven Active Traffic Management (ATM) gantries capable of displaying real-time speed, lane use, and incident messaging.
- 12 Wrong-Way Driver Alert Systems at six interchange locations: Martin Luther King Boulevard, Rancho Drive, Valley View Boulevard, Decatur Boulevard, Jones Boulevard, and Rainbow Boulevard, with two systems installed at each interchange.
- Two Strategic Traffic Management Sites for law enforcement and incident response operations.
- Additional intelligent transportation systems (ITS) infrastructure to support system integration and future traffic management operations.
Project Map
Project Website
NDOT has created a specific website for this project, which includes scheduling and traffic-control information. Visit www.ndotsafetech.com for more information.
