Nevada Department of Transportation
Home MenuDocuments
RSB Preferred Alternative 2 2023 Compressed
Reno-SBX_Flier_Fact-Sheet-map353048-1
RSB_ROD_Final
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_G_RTC_Part3 (1)
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report (1)
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Section 3.14 Commitments of Resources
FEIS_Section 3.13 Uses Versus Productivity
FEIS_Section 3.12 Indirect and Cumulative
FEIS_Section 3.11 Cultural Resources
FEIS_Chapter 6 Section 4f Evaluation
FEIS_Chapter 5 List of Preparers
FEIS_Chapter 4 Public Involvement
FEIS_Section 3.9 Vegetation Wildlife Fish
FEIS_Section 3.8 Water Resources
FEIS_Section 3.7 Visual Character
FEIS_Section 3.6 Transportation Services
FEIS_Section 3.10 Hazardous Materials
FEIS_Section 3.5 Air Quality
FEIS_Section 3.4 Traffic Noise
FEIS_Section 3.3 Environmental Justice
FEIS_Section 3.2 Community Resources
FEIS_Section 3.1 Introduction
FEIS_Front Matter
FEIS_Executive Summary
FEIS_Cover Signature Abstract
FEIS_Chapter 2 Alternatives
FEIS_Chapter 1 Project Need
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov
