Nevada Department of Transportation
Home MenuDocuments
2018 MS4 Permit SWMP Plan_Revised_November of 2025_All (R).
2018 MS4 Permit SWMP Plan_Revised_November of 2025_All (R)
Stormwater Pollution Prevention Plan SWPPP Template 018002SWPPP
2018 MS4 Permit SWMP Plan_Revised_February of 2025_All_R
Construction_Site_BMPs_Manual_Final_(February_2025)
2018 MS4 Permit SWMP Plan_Revised_December of 2024_All_R (2)
2018 MS4 Permit SWMP Plan_Revised_December of 2024_All_R
2018 MS4 Permit SWMP Plan_Revised_July of 2024_All_R
FINAL - Construction Sites (Spanish)
FINAL - Mining & Aggregate Facilities (Spanish)
FINAL - Industrial & Commercial Facilities (Spanish)
FINAL - Homeowners (Spanish)
NDOT Grant_Earmark Support Checklist
StormwaterPlanningDesignGuide_2023
2018 MS4 Permit SWMP Plan_Revised_October of 2022_All_2_R
Bridge I-1093 NS survey
Bridge G-1748 NS survey
Bridge G-1092 NS survey
2023 STATE PRESERVATION REPORT
2022 Performance Managment Report
Traffic and Construction Noise Analysis and Abatement Policy 15 May 2018.aa
Bridge 422 survey report
NDOT NOA & Erionite Commercial Import Material Guidance July 2019
C:\Users\kchmura\Documents\SWMPfinal_pimnotice4-24-19(wplan)
RPO Pettis et al
RPO Pettis et al
01_Pyramid ROD - FINAL 12072018
01_Pyramid ROD - FINAL 12072018
Z:\MS4 Permits\MS4 Permit Annual Reports\FY17_Annual Report_Final_(All)
Z:\PIO Stormwater\Annual Report Info\FY2018_Annual Report_Web(R)
C:\Users\kchmura\Desktop\2018 MS4 Permit with Letter_Signed
PoliticalSigns_YourHighways_2018Brochure
Property Inventory
NDOT Traffic and Construction Noise Analysis and Abatement Policy Eff July 2011 Last Rev 01 Dec 2017
Engineer Crash Request pdf format
CostPlusFixedFeeAgreements
ConsultantyInvoiceAndProgressReport
Citizen Crash Request pdf format
Bidders Preference Affidavit
Application and Permit for Occupancy of NDOT Right of Way
Admin_DriveDrugTest
2013_Intermodal_Fed_Grant_App
2013_09_11_Contract_and_Bonds_State
2013_09_11_Contract_and_Bonds_Federal
Terms and Conditions Relating to Right-of-Way Occupancy Permits
Telecommunications Annual Permit Application
StatementofQualification
Sign Permit Supplemental Application
Sign Permit Ownership Transfer Form
Sign Permit Application
ReleaseViewingPublicRecords
NDOT Safety Crash Request
Media Crash Request pdf format
Title_VI_Permanent_Program_Plan
RESOURCE BOOK (2)
Non-MPO_Tribal_Consult_Process
CORSIM Modeling Guidelines- Oct 2012
RBE_Guidelines_Final_2021_August
Traffic Forecasting Guidelines 12_2012
STPpppFinal2009
Project Management Guidelines Final V3 7-6-10
PRES BOOK WEB2
PIPfinal(rev)4-18-2014dw
Pioneer Program Guidelines 3rd Edition 2020
Partnering_Guide10_18_10v3b
NDOT_Right-of-Way_Manual_2016
Final Report Phase 1
Customer-Satisfaction-Survey-2009
ConstructionSurveyManual2012
2015_Road_Relinquishment_Guide
2015_Permanent_Reg_Road_Relinquishments
2015 fact book web
2013_04_16_Transportation_Funding_Programs
2011-02_Executive_Order
2009_Cost_Allocation
2006_Storm_Water_Quality_BMP_Manual
2002_Western_Nevada_Transportation_Study
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov
