Nevada Department of Transportation
Home MenuDocuments
- Henderson Interchange
Job#4577-TahoeBasinMap2023FullPage-v6
tahoe basin const map 2022 8.5x11
Henderson Interchange - Crash Analysis Report Final
tahoe basin const map 2022 8.5x11
NDOT Grant/Earmark Support Checklist
NDOT Sahara Safety Project FAQ Spanish FINAL
NDOT Sahara Safety Project FAQ FINAL
NDOT Sahara Safety Project Fact Sheet Spanish FINAL
NDOT Sahara Safety Project Fact Sheet FINAL
MtRoseCorridorPlan-Volume2_Apr2022-small
MtRoseCorridorPlan-Volume1_Apr2022-small (3)
US50 CMP - Round 2 Boards_24x36
April 2022 Upcoming Construction Projects
NDOT Sahara Avenue Safety Enhancement Project Fact Sheet March 2022.pdf FINAL
Revision_2 US50_Flyer
US50 CMP - Existing Conditions Memo_No_App
US50 CMP - Ex Cond Takeaways
NDOTUS395_ProjUpdate_2021 FINAL
Appendix H (1)
Appendix G
Appendix F (1)
Appendix E Combined
Appendix D Combined
Appendix C Combined_reduced
Appendix A Combined (1)
Appendix B Combined
NDOT_I-15 Flamingo-Sahara Feasibility Study_July 2021_FINAL_082521
2021-09_NDOT I-15_PEL_Questionnaire_and_Checklist_FINAL
NV I-515_Flier_Charleston final design
US50_Flyer
U.S. 50-Dayton fact sheet 5 10 2021 UPDATED
20200928 Winnemucca Interchanges LA FF
I-15 Tropicana Fact Sheet August 2020
I-15 Tropicana Interchange Phasing Narrative Memorandum 2 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum 1 of 2
I-15 Tropicana Interchange Phasing Narrative Memorandum -11-12-2019
Fact Sheet July 9 2020
0145Trop FULL SET 062420
nv-stip-2019
tahoe basin const map 2020 8.5x11
I-15 Tropicana EA - TSPR Final
I-15 Tropicana EA - TIAR Final
STIPFormalProcedureandGuid
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
STIP Formal Procedure and Guidance Document DRAFT_V9_4.23.2020_JJE
Handout Packet 11-15-19 rev2
I-15-Tropicana public hearing public notice 11 19 2019 FINAL
A I-15 Tropicana Appendix A Public Information Meeting Summaries
D I-15 Tropicana Appendix D Change in Control of Access Request
C I-15 Tropicana Appendix C NDOT Traffic and Construction Noise Analysis and Abatement Policy
B I-15 Tropicana Appendix B SHPO Correspondence (1)
00c I-15 Tropicana Appendix B SHPO Correspondence
EA I-15 Tropicana EA 10152019
NDOT US395_Proj Update_2019 Summer_rev2
I15 Tropicana Public Meeting 2 Meeting Packet FINAL
I15 Tropicana Fact Sheet 9 2019
Gemfield Groundbreaking Aug 2
U.S. 395 North Valleys Fact Sheet Updated May 2019
U.S. 395 North Valleys Citiens Advisory Board Presentation May 2019
C:\Users\h9003mmm\Documents\Marketing Ideas\I-580 Exit Number Flyer
NDOT US395_Proj Update_2019 Spring
Safety and Operational Improvements for US 50 Phase 2
ONYX-BOWERS-Display
US 50 Display from Roys Road to Hackberry Street
US 50 Display from Hackberry Street to Silver Springs
Roundabout at Silver Springs
I-11 PEL Questionnaire and Checklist_02-01-19
I-11 Executive Summary 2018
December 2018 Alternatives Analysis Report
December 2018 I-11 Public Outreach Summary
C:\Users\h1003aep\Desktop\I-15 CC215 Welcome Packet
C:\Users\h1003aep\Downloads\NDOT I-15 CC215 N Phase 4 Public Meeting PPT_12-4-18
C:\Users\h1003aep\Downloads\I-15 CC215 Welcome Packet
Draft I-11_PEL_Questionnaire_and_Checklist_Questionnaire_11-11-18
I-11 Stakeholder Meeting October 2018 Webinar Slides
I-11 Resource Agency Meeting October 2018 Webinar Slides
Preliminary I-515 Southband Lane Drop Elimination & Auxiliary Lane Renderings
C:\Users\h1003aep\Desktop\SB 515 lane drop
SR 28 Closure Flyer
I-11 NNAA_Public Outreach 2018_v24
Appendix A -11 NNAA Outreach Summary DRAFT - October 2018
I11NNAA_Alternatives Analysis_2018-10-08
Appendix G - I11 NNAA - Implementation Strategies
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
C:\Users\h1003aep\Desktop\NDOT_NWcorrPh3A-3E_improv_handout_20180911
I-11_NNAA_Board_Summer2018_AlternativesMap
I-11 NNAA_Public Outreach 2018_v17
I-11 NNAA - Pub Mtg 2 Handout
FFY19 STIP Process DRAFT_AugBoard_7-18-2018
I11NNAA_Alternatives Analysis Memo-DRAFT_2018_07_18
AppF_I11NNAA_Connectivity-North-I80
AppE_I11NNAA_EnvironmentalDetails
AppD_I11NNAA_Transportation_Plans
AppC_I11NNAA_Impacts-of-Bypasses
AppB_I11NNAA_ED-questionnaire
Ely Fact Sheet July 2018
I-11 Meeting Flyer
I-11 Frequently Asked Questions - June 2018
I-11 NNAA_Methodology Memo March 2018
I11NNAA_PublicOutreach2018
I-11 NNAA_Impacts of Bypasses_2018-05
I-11 NNAA_Connectivity North I-80_2018-05
I-11 NNAA - Phase 1 Outreach Summary-Draft
Birds Eye View of Starr Interchange
Tahoe Basin Construction Information
NDOT Nellis Road Improvement Project FAQ 2018
NDOT Nellis Road Improvement Project DRAFT of PI Plan
07. Map Board_031618
06. I-11_NNAA_Alt Corridors Plot
05. I-11 NNAA - Pub Mtg 1 Handout
04. I-11 NNAA_Presentation - Public Mtg 1 Slides
03. I-11 NN PEL - Stakeholder Mtg 1
I-11 NNAA_Public Outreach 2018_v130
DRAFT of I-11 North NV - Methodology Memo - 2018-03-02
Garnet Interchange Fact Sheet 2018
final I-15 Tropicana Fact Sheet
Final Report 12-30-2015
Appendix 9 – TDI 3 Levels – DM TDI ALT1_BASE_CONFIGA1_36x48
Appendix 8 – I-15_Tropicana Traffic Report_Interchange Analysis-Final Report122915 signed
Appendix 7 – I-15 Tropicana Alternatives Selection Meeting
Appendix 6 – I-15 Tropicana Alternatives Screening Meeting
Appendix 5 – Tropicana Exit Concept Memo FINAL
Appendix 4 – Interim Concepts Memo Review 9-21-15 Final
Appendix 3 – Initial Concepts Report FINAL
Appendix 2 – Traffic Forecasting Memorandum (Methodology Memo attached)
Appendix 1 – CORSIM Calibration Memo (Methodology Memo in Attachment 1)
Appendix 17 – I-15-Tropicana_PEL_Questionnaire_and_Checklist_Nevada_v5
Appendix 16 – Golden Palm
Appendix 15 – Public Open House Summary
Appendix 14 – Public Meeting Materials
Appendix 13 – Public Open House Advertisements
Appendix 12 – Fact Sheet
Appendix 11 – Seering Committee Meeting Minutes
Appendix 10 – TDI 3 LEVEL TROP FINAL 2015 WIZARD SUMMARY
NDOT_NWcorrPh3A-3E_improv_handout_20170927
NDOT_NWcorrPh2B-5_improv_handout_20170928
FTA Transit NDOT 3 Year Goal Methodology 2017
USAPkwy_FactSheet[10] Spring 2017
USA Parkway PerspectiveViews
Sign Replacement Project Along I-11/U.S. 95/U.S. 93
Project Overview
The Nevada Department of Transportation (NDOT) is beginning a $3.02M project in October 2024 to replace signage along the I-515/U.S. 95/U.S. 93 corridor from the Henderson Interchange to Kyle Canyon Road to reflect the Federal Highway Administration’s designation of this route as Interstate 11 (I-11). The FHWA officially designated this stretch as I-11 on November 24, 2023.
While the interstate now carries the I-11 designation, it will also retain its U.S. 95 and U.S. 93 designation, with I-11 taking precedence. The project, expected to be completed by fall 2025, involves replacing approximately 1,075 sign panels using existing overhead sign supports and foundations.
Most of the work will have minimal impact on traffic, but brief, temporary overnight traffic stoppages may be needed on I-11, I-15, and I-215 to ensure the safe installation of new signs. Lane or ramp restrictions may also be required throughout the project. NDOT will provide advance notice of any closures or restrictions to help drivers plan their routes.
The new signage supports the I-11 corridor’s goal to improve north-south travel and boost the regional economy by easing the flow of goods. NDOT is currently conducting a feasibility study to identify improvements necessary for converting U.S. 95 between Kyle Canyon Road and Mercury Highway into a fully access-controlled interstate highway. This study builds on the 2018 I-11 Northern Nevada Alternatives Analysis, aiming to refine past recommendations and guide future development.
Once completed, I-11 is expected to serve as a vital link between Mexico and Canada, supporting economic growth and connectivity in Nevada and the Intermountain West region. NDOT’s efforts to advance this project align with long-term goals to strengthen regional trade routes and create a more resilient and integrated transportation network.
Project Map
Contact
NDOT Project Manager:
Dallan Affleck, PE
daffleck@dot.nv.gov
