Nevada Department of Transportation
Home MenuDocuments
74271 Henderson Interchange CRA
Henderson Interchange - Traffic Safety Analysis Report Final
Henderson Handout
Henderson Interchange PPT Jul 22 2021 (1)
06.14.21.HD Interchange Project Sheet
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
Attachment 2 74271 Option 2A NEPA E-W Guide Concept Plan 05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
Attachment 1 74271 Option 2A_NEPA_N-S Exhibit 04-28-21
Attachment 1 74271 Option 2A_NEPA_E-W Exhibit 04-28-21
Attachment 3 74271 Option 2A_Conceptual MOT Phasing_reduced
Appendix 03 Alternatives Screening Report_reduced
Attachment 2 74271 Option 3_NEPA_N-S_Guide_Sign_Concept_Plan_02-04-21
Attachment 2 74271 Option 3_NEPA_E-W_Guide_Sign_Concept_Plan_02-04-21
Attachment 2 74271 Option 2A_NEPA_N-S_Guide_Sign_Concept_Plan_05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (1)
Appendix 17 Limited Geotechnical Assessment (1)
Appendix 16 Drainage Facilities
Appendix 15 FEMA Floodplain Documentation
Appendix 14 TAC Meeting Minutes
Appendix 13 UPRR Coordination
Appendix 12 Summary of COH Hazmat Reports
Appendix 11 Planning and Environmental Linkages
Appendix 10 Public Involvement Activities
Appendix 09 Cost Risk Assessment
Appendix 08 BCA Report
Appendix 07 Cost Estimate Worksheets
Appendix 06 Conceptual Plans
Appendix 05 Bridge Type Selection Study
Appendix 04 Utilities
Appendix 02 Synchro Output
Appendix 01 Traffic Forecasting Memo
HD Interchange Project Sheet
Sunset Road Paving Project
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a paving and preservation project on Sunset Road (State Route 562). Work will improve nearly three miles of pavement between Las Vegas Boulevard and Annie Oakley Drive, enhancing safety and extending the life of the roadway. The project is anticipated to be completed by Spring 2026.
The project includes milling and paving Sunset Road as well as lowering utilities, removing and replacing median islands, and upgrading striping and electrical items.
Current Restrictions
24 hours daily beginning Monday evening, May 11, through Tuesday morning, May 19:
- Southbound Airport Connector ramp to eastbound I-215 reduced to one lane
- Single lane closure on southbound Airport Connector approaching ramp work zone
8 p.m. Monday, May 11 to 5 a.m. Tuesday, May 12:
- Double right lane closure on southbound Airport Connector
- Sunset Road/ Grier Road on-ramp to Airport Connector closed
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Single lane closure on southbound Airport Connector ramp to Hidden Well Road
8 p.m. Tuesday, May 12 to 5 a.m. Wednesday, May 13:
- Double right lane closure on southbound Airport Connector
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Single lane closure on southbound Airport Connector ramp to Hidden Well Road
8 p.m. Wednesday, May 13 to 5 a.m. Thursday, May 14:
- Double left lane closure on southbound Airport Connector
- Southbound Airport Connector ramp to Warm Springs Road reduced to one lane; full closure from 12 a.m. to 5 a.m.
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Detour routes will direct motorists to Las Vegas Boulevard and eastbound I-215 to reconnect with Warm Springs Road
8 p.m. Thursday, May 14 to 5 a.m. Friday, May 15:
- Southbound Airport Connector ramp to westbound I-215 reduced to one lane; full closure from 12 a.m. to 5 a.m.
- Double left lane closure on southbound Airport Connector
- Detour routes will direct motorists to Las Vegas Boulevard to access westbound I-215
During daytime hours, multiple lanes will remain open in both directions to accommodate heavy traffic volumes, particularly near the airport connector.
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
