Nevada Department of Transportation
Home MenuDocuments
- Reports
- Final Environmental Impact Statement
- I-515 ADS
- Naturally Occurring Asbestos Information
- NOS Phase Reports
- Carson City Freeway
- USA Parkway Reports
FFY23 DRAFT Annual Work Program
FFY23 - FFY26 DRAFT STIP
STIP Q3 2022 (21-25)
20 year forecast for STIP 2017 FY 2016 actuals v2
RFQ 432-16-110 - Garnet Design-Build Project - Conceptual Plans
Powerpoint Garnet Public Info Mtg 100616
US95NW_project_map
US95NW_Project_Management_Plan
US95NW_Financial_Plan
US 95-CC 215 Interchange (Phase 3) Map
US 95 NW Phase 2A Roadway Improvements Map
US 95 NW Phase 2 Landscape and Aesthetics Rendering
US 95 NW Environmental ReEvaluation
US 95 NW Corridor Improvements Overview Map
Phasing Displays 3-10-16
USAPkwy FactSheet6 02142015
USAHandout_final(jm)8-8-16
USA Pkwy PIM ppt 8-3-16 FINAL
US95_Newsletter_May2015
US 95 Nov 2015 Meeting Packet_Print (1)
Phasing Displays 3-10-16(1)
Phasing Displays 3-10-16
NDOTnewsad_2015_4.9x6.75_rev
I-15 EA102208 -2-Appendices
I-15 EA102208 -1-Report
Final Starr Handouts
STARR FAQ V3
Fact Sheet-Spring 2016
TahoeBasin2015
tahoe basin const map 2017
Carson City Freeway
SR28-July-26-PIM-Packet_v2
SR-28-Flyer-Public-Hearing-042616
SR 28 Fact Sheet FINAL(1)
SR 28 Fact Sheet FINAL
sr 28 cmp for web-131004
Project News for the Community Volume 1 Issue 2
Project News for the Community Volume 1 Issue 1
EA North Demonstration Project(1)
Reno Spaghetti Bowl Charrette Report_Final red
Charrette Report Appendix_Final red
Kietzke SMP Priority 2-3
Kietzke Safety Management Plan Presentation
Kietzke Safety Management Plan PDF
Kietzke Lane Safety Management Plan Full Report Appendix
Kietzke Lane Safety Management Plan Final Report
Kietzke Lane Public Meeting Presention Feb 21, 2013
Kietzke Lane Public Meeting No. 2 Handout
Kietzke Lane Priority 1 Recommendations
Kietzke Lane Pedestrian Bike Crash Data
Kietzke Lane Crash Type Graph
Kietzke Lane Crash Severity Graph
CLV 515-Charleston Feasiblity Study Rev 4 signed
515 Factsheet Option 3
515 Charleston (final)Handouts Sep 22
BCBypassRod
RR_Pass_Intg
3580Rendering
Sunset Road Paving Project
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a paving and preservation project on Sunset Road (State Route 562). Work will improve nearly three miles of pavement between Las Vegas Boulevard and Annie Oakley Drive, enhancing safety and extending the life of the roadway. The project is anticipated to be completed by Spring 2026.
The project includes milling and paving Sunset Road as well as lowering utilities, removing and replacing median islands, and upgrading striping and electrical items.
Current Restrictions
24 hours daily beginning Monday evening, May 11, through Tuesday morning, May 19:
- Southbound Airport Connector ramp to eastbound I-215 reduced to one lane
- Single lane closure on southbound Airport Connector approaching ramp work zone
8 p.m. Monday, May 11 to 5 a.m. Tuesday, May 12:
- Double right lane closure on southbound Airport Connector
- Sunset Road/ Grier Road on-ramp to Airport Connector closed
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Single lane closure on southbound Airport Connector ramp to Hidden Well Road
8 p.m. Tuesday, May 12 to 5 a.m. Wednesday, May 13:
- Double right lane closure on southbound Airport Connector
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Single lane closure on southbound Airport Connector ramp to Hidden Well Road
8 p.m. Wednesday, May 13 to 5 a.m. Thursday, May 14:
- Double left lane closure on southbound Airport Connector
- Southbound Airport Connector ramp to Warm Springs Road reduced to one lane; full closure from 12 a.m. to 5 a.m.
- Single lane closure on southbound Airport Connector ramp to westbound I-215
- Detour routes will direct motorists to Las Vegas Boulevard and eastbound I-215 to reconnect with Warm Springs Road
8 p.m. Thursday, May 14 to 5 a.m. Friday, May 15:
- Southbound Airport Connector ramp to westbound I-215 reduced to one lane; full closure from 12 a.m. to 5 a.m.
- Double left lane closure on southbound Airport Connector
- Detour routes will direct motorists to Las Vegas Boulevard to access westbound I-215
During daytime hours, multiple lanes will remain open in both directions to accommodate heavy traffic volumes, particularly near the airport connector.
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
