Nevada Department of Transportation
Home MenuDocuments
2025 NDOT Transition Plan
ADA TRANS PLAN 2022
2020 ADA TRANS PLAN large print
2022 ADA TRANS PLAN
ADA Field Guide 2022
ADA Measuring Guide 2019
2017 ADA Trans Plan book web
2017 ADA Trans Plan book large web
Fillable Transition Plan Request Form
Fillable Transition Plan Request Form
Fillable Recommendation and Comment Form
Fillable Recommendation and Comment Form
Fillable Complaint Form
Fillable Complaint Form
FHWA Comments and NDOT Updates
FHWA Comments and NDOT Updates
Complaint Form
Comment List with Responses
Comment List with Responses
adaag
2016 NDOT ADA Transition Plan
2016 NDOT ADA Transition Plan
2016 NDOT (Large Print) ADA Transition Plan
2016 NDOT (Large Print) ADA Transition Plan
2015_FieldGuide
2011_PROWAG
Sunset Road Paving Project
Project Overview
The Nevada Department of Transportation (NDOT) is undertaking a paving and preservation project on Sunset Road (State Route 562). Work will improve nearly three miles of pavement between Las Vegas Boulevard and Annie Oakley Drive, enhancing safety and extending the life of the roadway. The project is anticipated to be completed by Summer 2026.
The project includes milling and paving Sunset Road as well as lowering utilities, removing and replacing median islands, and upgrading striping and electrical items.
Current Restrictions
Nightly (9 p.m. to 5 a.m.) Sunday night through Friday morning, through Thursday, July 30:
- Lane reductions on Sunset Road from South Las Vegas Boulevard to Annie Oakley Drive
- Left and right turn lanes/pockets as well as some right turn lanes will be closed periodically
Nightly (11 p.m. to 7 a.m.) Sunday night through Friday morning, through Monday, August 10:
- Sunset Rd/Grier Drive to Airport Connector ramp closed
- Intermittent closures from Airport Connector to westbound I-215
- Intermittent closures from Airport Connector to Hidden Well Rd
- Intermittent closures from Airport Connector to Warm Springs Rd
- Reduced lanes from southbound Airport Connector from Grier Dr overpass to I-215
During daytime hours, multiple lanes will remain open in both directions to accommodate heavy traffic volumes, particularly near the airport connector.
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.