Nevada Department of Transportation
Home MenuDocuments
74271 Henderson Interchange CRA
Henderson Interchange - Traffic Safety Analysis Report Final
Henderson Handout
Henderson Interchange PPT Jul 22 2021 (1)
06.14.21.HD Interchange Project Sheet
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
COH_Henderson Feasibility Study_FINAL_021920 (1)
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (2)
Attachment 2 74271 Option 2A NEPA E-W Guide Concept Plan 05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
Attachment 1 74271 Option 2A_NEPA_N-S Exhibit 04-28-21
Attachment 1 74271 Option 2A_NEPA_E-W Exhibit 04-28-21
Attachment 3 74271 Option 2A_Conceptual MOT Phasing_reduced
Appendix 03 Alternatives Screening Report_reduced
Attachment 2 74271 Option 3_NEPA_N-S_Guide_Sign_Concept_Plan_02-04-21
Attachment 2 74271 Option 3_NEPA_E-W_Guide_Sign_Concept_Plan_02-04-21
Attachment 2 74271 Option 2A_NEPA_N-S_Guide_Sign_Concept_Plan_05-04-21
Attachment 2 74271 Option 2A_NEPA_E-W_Guide_Sign_Concept_Plan_05-04-21
Attachment 1 74271 Option 3_NEPA_N-S Exhibit 02-04-21
Attachment 1 74271 Option 3_NEPA_E-W Exhibit 02-04-21
74271_Henderson Interchange Alternatives Analysis Report_May 2021 (1)
Appendix 17 Limited Geotechnical Assessment (1)
Appendix 16 Drainage Facilities
Appendix 15 FEMA Floodplain Documentation
Appendix 14 TAC Meeting Minutes
Appendix 13 UPRR Coordination
Appendix 12 Summary of COH Hazmat Reports
Appendix 11 Planning and Environmental Linkages
Appendix 10 Public Involvement Activities
Appendix 09 Cost Risk Assessment
Appendix 08 BCA Report
Appendix 07 Cost Estimate Worksheets
Appendix 06 Conceptual Plans
Appendix 05 Bridge Type Selection Study
Appendix 04 Utilities
Appendix 02 Synchro Output
Appendix 01 Traffic Forecasting Memo
HD Interchange Project Sheet
U.S. 95 Pavement Preservation Project near Boulder City
Project Overview
The Nevada Department of Transportation (NDOT) will begin a $41 million federally-funded pavement preservation project on U.S. 95 in Clark County in late February, improving roadway conditions on a key corridor south of Boulder City.
The project spans approximately 17 miles of U.S. 95, from approximately 7 miles north of Nelson Road to nearly 3 miles south of the Interstate 11 junction (mileposts 37.85 to 55.15). Work includes milling and resurfacing the roadway, as well as repairing damaged pavement. Additional improvements include updated striping and signage, drainage and lighting upgrades, and installation of tortoise fencing.
Current Restrictions
24/7, Monday, May 11 through Monday, June 22:
- North and southbound U.S. 95 reduced to one lane between MP 50 and MP 55, near I-11/U.S. 95 junction
- Lane closures will shift between the left and right sides of the roadway as work progresses.
Construction is anticipated to be completed by winter 2026, weather permitting. During active construction, the speed limit will be reduced to 55 mph through work zones for the safety of both drivers and construction crews.
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.
