Nevada Department of Transportation
Home MenuDocuments
RSB Preferred Alternative 2 2023 Compressed
Reno-SBX_Flier_Fact-Sheet-map353048-1
RSB_ROD_Final
FEIS_Appendix_H_CCOAreport_Part3
FEIS_Appendix_H_CCOAreport_Part2
FEIS_Appendix_H_CCOAreport_Part1
FEIS_Appendix_D05B_Highway_Traffic_Noise_Report
FEIS_Appendix_G_RTC_Part3 (1)
FEIS_Appendix_G_RTC_Part2
FEIS_Appendix_G_RTC_Part1
FEIS_Appendix_F3_F4_F5
FEIS_Appendix_F2_Part2
FEIS_Appendix_F2_Part1
FEIS_Appendix_F1
FEIS_Appendix_E_Agency_Public_Involvement
FEIS_Appendix_D14_IndirectCumulativeReport
FEIS_Appendix_D13_CulturalResources_AOE_Part2
FEIS_Appendix_D13_CulturalResources_AOE_Part1
FEIS_Appendix_D12_Hazardous_Material
FEIS_Appendix_D11_Veg_Wildlife_Fish_Report
FEIS_Appendix_D10_Biological_Opinion
FEIS_Appendix_D09_Drainage_Design_Report
FEIS_Appendix_D08_Aquatic_Resource_Inventory
FEIS_Appendix_D07_Visual_Impact_Assmt_Report
FEIS_Appendix_D06_AirQuality_Report
FEIS_Appendix_D05A_Pref_Alt_Traffic_Noise
FEIS_Appendix_D04_Environmental_Justice
FEIS_Appendix_D03_RelocationImpactAnalysis_Part2
FEIS_Appendix_D03_RelocationImpactAnalysis_Part1
FEIS_Appendix_D02_Community Impacts Report (1)
FEIS_Appendix_D01_Impact_Assessment_Methodologies
FEIS_Appendix_C_Traffic_Analysis_Report
FEIS_Appendix_B2_Design_Report_Part9
FEIS_Appendix_B2_Design_Report_Part13
FEIS_Appendix_B2_Design_Report_Part12
FEIS_Appendix_B2_Design_Report_Part11
FEIS_Appendix_B2_Design_Report_Part10
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Appendix_B1_Initial_Concepts_Report
FEIS_Appendix_A_Existing_Freeway_Conditions_Report
FEIS_Index
FEIS_Appendix_B2_Design_Report_Part8
FEIS_Appendix_B2_Design_Report_Part7
FEIS_Appendix_B2_Design_Report_Part6
FEIS_Appendix_B2_Design_Report_Part5
FEIS_Appendix_B2_Design_Report_Part4
FEIS_Appendix_B2_Design_Report_Part3
FEIS_Appendix_B2_Design_Report_Part2
FEIS_Appendix_B2_Design_Report_Part1
FEIS_Section 3.14 Commitments of Resources
FEIS_Section 3.13 Uses Versus Productivity
FEIS_Section 3.12 Indirect and Cumulative
FEIS_Section 3.11 Cultural Resources
FEIS_Chapter 6 Section 4f Evaluation
FEIS_Chapter 5 List of Preparers
FEIS_Chapter 4 Public Involvement
FEIS_Section 3.9 Vegetation Wildlife Fish
FEIS_Section 3.8 Water Resources
FEIS_Section 3.7 Visual Character
FEIS_Section 3.6 Transportation Services
FEIS_Section 3.10 Hazardous Materials
FEIS_Section 3.5 Air Quality
FEIS_Section 3.4 Traffic Noise
FEIS_Section 3.3 Environmental Justice
FEIS_Section 3.2 Community Resources
FEIS_Section 3.1 Introduction
FEIS_Front Matter
FEIS_Executive Summary
FEIS_Cover Signature Abstract
FEIS_Chapter 2 Alternatives
FEIS_Chapter 1 Project Need
U.S. 95 Pavement Preservation Project near Boulder City
Project Overview
The Nevada Department of Transportation (NDOT) will begin a $41 million federally-funded pavement preservation project on U.S. 95 in Clark County in late February, improving roadway conditions on a key corridor south of Boulder City.
The project spans approximately 17 miles of U.S. 95, from approximately 7 miles north of Nelson Road to nearly 3 miles south of the Interstate 11 junction (mileposts 37.85 to 55.15). Work includes milling and resurfacing the roadway, as well as repairing damaged pavement. Additional improvements include updated striping and signage, drainage and lighting upgrades, and installation of tortoise fencing.
Current Restrictions
24/7, Monday, April 6 through Friday, May 22:
• North and southbound U.S. 95 reduced to one lane between MP 44 and MP 50, north of Eldorado Valley Dr
• Lane closures will shift between the left and right sides of the roadway as work progresses
Construction is anticipated to be completed by winter 2026, weather permitting. During active construction, the speed limit will be reduced to 55 mph through work zones for the safety of both drivers and construction crews.
Motorists should use caution while traveling through work zones, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions. The schedule is subject to change due to weather or other factors.
Additional state highway information is available at dot.nv.gov or by calling (775) 888-7000. For the latest state highway conditions, visit nvroads.com or call 511 before driving. Also follow @NevadaDOTVegas on X for traffic and project updates in southern Nevada, and @nevadadot on X, Facebook, and Instagram for updates from across the state.